Wyoming Statewide Rule
Wyoming Net Metering Caps Solar Systems at 25 Kilowatts
Key Facts
- Statute
- Wyo. Stat. 37-16-101 to 104
- System cap
- 25 kilowatts
- Eligible fuel
- Solar, wind, biomass, hydropower
- Oversight
- Public Service Commission
- Excess generation
- Credited to next month's bill
Summary
Wyoming has no statewide solar building-permit law, but the Net Metering Act lets customer-generators interconnect solar systems up to 25 kilowatts and bank excess generation as monthly bill credits, with the Public Service Commission overseeing utilities.
(viii) "Net metering system" means a facility for the production of electrical energy that: (A) Uses as its fuel either solar, wind, biomass or hydropower; (B) Has a generating capacity of not more than twenty-five (25) kilowatts; (C) Is located on the customer-generator's premises; (D) Operates in parallel with the electric utility's transmission and distribution facilities; and (E) Is intended primarily to offset part or all of the customer-generator's requirements for electricity.
Full Breakdown
Wyoming's Net Metering Act (Wyo. Stat. sections 37-16-101 through 37-16-104) governs grid-connected solar statewide. A qualifying net metering system must use solar, wind, biomass or hydropower and have a generating capacity of not more than twenty-five (25) kilowatts, located on the customer-generator's premises. The electric utility must offer a bidirectional energy meter and cannot charge a net-metering customer any fee that raises the minimum monthly charge above others in the same rate class. Excess kilowatt-hours credit to the following month's bill; unused year-end credit is sold to the utility at its filed avoided cost. Actual construction permits are issued by local building departments, not the state.
Violations & Penalties
Systems over twenty-five kilowatts do not qualify for net metering. The customer-generator must provide utility-approved lockable isolating equipment, and the Public Service Commission may adopt additional control and testing requirements for safety and system reliability.
Frequently Asked Questions
Does Wyoming require a state permit for solar panels?
How large a solar system can I net meter in Wyoming?
What happens to my extra solar generation?
Sources
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.