Georgetown County, SC Swimming Pools & Spas: Pool Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Swimming pool permit rules in Georgetown County, SC, also covering above-ground pools, in-ground pools, and spa installations, set fencing, barrier, alarm, and inspection requirements.

Key Facts

Permit required
Yes, before swimming pool construction begins
Issuing authority
Georgetown County Building Department
Governing section
County Code Sec. 7-10(a)
Late-permit penalty
Double the standard fee (Sec. 7-20(a))
Base fee, up to $1,000 value
$30.00
Fee scaling
$6.50 per additional $1,000 up to $50,000

Summary

Before building a pool in unincorporated Georgetown County, homeowners must get a building permit from the county Building Department. County Code Sec. 7-10 lists swimming pool construction alongside plumbing and electrical work as tasks that cannot start without a permit from the building official. Skipping it triggers the same double-fee penalty that covers any unpermitted construction countywide.

These county ordinances apply to unincorporated areas of Georgetown County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(a)A building permit is required if the work involves any referenced code or any county ordinance. No construction, remodeling, plumbing, electrical, mechanical or gas work, nor swimming pool construction or land development shall begin without securing the required permit from the building official or authorized representative. ... if any person commences any work on a building or structure, starts any development or places any mobile home before obtaining the necessary permit from the building official, he shall be subject to the penalty of a double permit fee, ... (1)For a valuation up to and including $1,000.00, the fee shall be $30.00.(2)For a valuation of $1,001.00 up to and including $50,000.00, the fee shall be $30.00 for the first $1,000.00 plus $6.50 for each additional thousand or fraction thereof.

Full Breakdown

Georgetown County treats a residential pool exactly like any other structure that needs a permit under Sec. 7-10(a): the building official has to sign off before work starts, and the code lists swimming pool construction by name alongside plumbing, electrical, mechanical and gas work as activities that cannot begin without one. The only carve-out in Sec. 7-10(b) is for pure home improvements, defined narrowly as painting, replacing windows and doors, repairing plumbing fixtures, or replacing rotten wood, none of which cover building a pool.

Fees follow the county's standard valuation-based schedule in Sec. 7-20(b). A pool project valued at $1,000.00 or less costs a flat $30.00 permit fee; between $1,001.00 and $50,000.00, the fee is $30.00 for the first $1,000.00 plus $6.50 for every additional thousand dollars or fraction of it, so a mid-size in-ground pool valued well into the tens of thousands of dollars can carry a permit fee in the hundreds of dollars before a shovel touches the ground.

Starting the pool before the permit is issued triggers Sec. 7-20(a)'s double-fee penalty: the county charges twice the normal permit fee once it discovers unpermitted work underway, on top of requiring the permit application itself. The Georgetown County Building Department, supervised by the county building official, handles both the permit and the inspections that follow, and that authority covers only the unincorporated county, not the City of Georgetown, Andrews, or the Town of Pawleys Island, each of which runs its own building department.

Violations & Fines

Building a pool without first pulling a permit triggers the double-fee penalty in Sec. 7-20(a): the county charges twice the normal building permit fee once work starts without the required permit. For a project valued up to $1,000.00, the base fee is $30.00; between $1,001.00 and $50,000.00 the fee is $30.00 for the first $1,000.00 plus $6.50 for each additional thousand, so the double-fee penalty for an average pool build easily runs into the hundreds of dollars, on top of the underlying permit fee itself.

Frequently Asked Questions

Do I need a permit to build a pool in unincorporated Georgetown County?
Yes. County Code Sec. 7-10(a) lists swimming pool construction by name among the work the Georgetown County Building Department requires a permit for before it starts, alongside plumbing, electrical, mechanical and gas work. The permit must come from the building official or an authorized representative before the contractor breaks ground.
What happens if I build a pool before getting a permit?
Sec. 7-20(a) doubles the required building permit fee for any work, including pool construction, that starts before the permit is issued. On a project valued at $50,000.00 or less the base fee already runs $30.00 for the first $1,000.00 plus $6.50 per additional thousand, so starting early roughly doubles that bill.
Who issues the building permit for a residential pool?
The Georgetown County Building Department, under the county building official, issues the permit. Sec. 7-10(a) requires the permit be secured from the building official or an authorized representative before any swimming pool construction, land development, or code-covered construction work begins in the unincorporated county.

Sources & Official References

Other rules in Georgetown County

All Georgetown County rules

Compare Georgetown County to another location·View the South Carolina swimming pools & spas overview

Get notified when Pool Permits in Georgetown County, SC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.