Haverford, PA Swimming Pools & Spas: Pool Permits (2026)
Swimming pool permit rules in Haverford, PA, also covering above-ground pools, in-ground pools, and spa installations, set fencing, barrier, alarm, and inspection requirements.
Key Facts
- Permit issuer
- Zoning Officer, secured before construction starts
- Application
- Written, with plan of pool size, shape, location and enclosure
- Decision deadline
- Granted or refused within 30 days of application
- Permit expiry
- Void if work not substantially commenced within six months
- Fee schedule
- $250 in-ground, $75 aboveground
- Maximum fine
- $600 plus costs, each day a separate offense
Summary
In Haverford Township, Delaware County, Pennsylvania, no swimming pool can be constructed without a permit secured in advance from the Zoning Officer. The written application must include a plan showing the size, shape and location of the pool and its enclosure. The fee schedule lists $250 in-ground and $75 aboveground.
(4) No such use shall be constructed in the Township except in accordance with a permit therefor previously secured from the Zoning Officer of the Township. The application for said permit shall be accompanied by a plan showing the size and location of any recreational facility and its enclosure and such other information as may be necessary for the Zoning Officer to determine whether said facility complies with the requirements of this section. ... (3) No swimming pool shall be constructed in the Township except in accordance with a permit therefor previously secured from the Zoning Officer of the Township, upon written application accompanied by a plan showing the size, shape and location of the swimming pool and its enclosure and such other information as may be necessary for the Zoning Officer to determine whether the pool complies with the requirements of this chapter.
Full Breakdown
In Haverford Township, paperwork comes before digging. Section 182-703B(3) of the Township Code says no swimming pool shall be constructed in the Township except in accordance with a permit previously secured from the Zoning Officer. The application is written and carries a plan showing the size, shape and location of the pool and its enclosure, plus whatever other information the Zoning Officer needs to decide whether the pool complies with the zoning chapter.
The code treats a pool as a structure for permit purposes. Under § 182-703A(2), open private recreational uses with permanent surfaces are considered structures for the purpose of permits and certain other regulations, although they are not counted as floor area in computing building coverage. Section 182-703A(3) keeps these uses out of front yards and at least 10 feet from any property line, and § 182-703B(1) repeats the 10-foot distance for pools, measured from the waterline.
The general zoning permit rules in Article IX add the timing. A zoning permit is issued simultaneously with the required building permit (§ 182-902A). Permits are granted or refused within 30 days after the date of application, and a refused applicant is told of the right to appeal to the Zoning Hearing Board (§ 182-902C(2)). A permit is void if the authorized work is not substantially commenced within six months of issuance and pursued with due diligence (§ 182-902D). The Zoning Officer has no power to permit any construction that does not conform to the chapter (§ 182-901A(1)).
Fees are set outside the zoning chapter. The Chapter A187 fee schedule lists $250 for in-ground pools, including bonding and fence enclosure, and $75 for aboveground pools. Section 182-704 requires compliance with Chapter 78, Erosion and Sediment Control; Stormwater Management, in all districts.
Violations & Fines
Building a pool without the permit violates § 182-703. Under § 182-901H, a person, firm or corporation violating the zoning chapter faces a fine not exceeding $600 and costs of prosecution, including attorney's fees, after conviction before a District Justice of the Peace, and each day is a separate offense. The Zoning Officer receives fees and issues the necessary stop orders (§ 182-901B(5)), and the Board of Commissioners can bring an action to restrain or abate a violation.
Frequently Asked Questions
Do I need a permit to build a swimming pool in Haverford Township?
What goes on the pool permit application?
How long does Haverford Township take to decide a pool permit?
What does a pool permit cost in Haverford Township?
Sources & Official References
Other rules in Haverford
Compare Haverford to another location·View the Pennsylvania swimming pools & spas overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.