Swimming pool permit rules in St. Charles County, MO, also covering above-ground pools, in-ground pools, and spa installations, set fencing, barrier, alarm, and inspection requirements.

Key Facts

Above-ground pool permit fee
$100 minimum
In-ground pool permit fee
$150 minimum
Fee alternative
Construction cost x annual fee multiplier
Governing permit code
Building Code § 500.100
Canceled application charge
$60 or 25% of fee
Private pool exemption
Exempt from Aquatic Code operating permit

Summary

Building an above-ground or in-ground swimming pool in unincorporated St. Charles County requires a building permit under the Building Code, Section 500.100, before work begins. The Division of Building and Code Enforcement charges $100 for an above-ground pool and $150 for an in-ground pool, or the estimated construction cost times the annual permit-fee multiplier if that is higher, under County Code § 505.020(D)(1)(e).

These county ordinances apply to unincorporated areas of St. Charles County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

The Division of Building and Code Enforcement shall charge the following fees for miscellaneous permits issued under the Building Code, Section 500.100 of this Title: (1) For an above-ground swimming pool: One hundred dollars ($100.00) or the estimated cost of construction multiplied by the "Permit Fee Multiplier" in Section 505.020(A)(2)(c) of this Chapter, whichever is greater. (2) For an in-ground swimming pool: One hundred fifty dollars ($150.00) or the estimated cost of construction multiplied by the "Permit Fee Multiplier" in Section 505.020(A)(2)(c) of this Chapter, whichever is greater. ... "Estimated cost of construction", as used in this Subsection, means the higher of the following: estimated cost of construction as stated by applicant for permit or the cost of labor and material for the work to be permitted as estimated by a plan review engineer of the Division of Building and Code Enforcement according to current data supplied by the Marshall Valuation Service as published by the Marshall and Swift Publication Company, Los Angeles, California.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4863880; v61 updated 2026-05-11; through 05-11-2026).

Full Breakdown

St. 150). Subsection (D)(1)(e) lists the pool fees specifically: $100 for an above-ground pool and $150 for an in-ground pool, each measured against the estimated cost of construction multiplied by the current "Permit Fee Multiplier," whichever figure is larger. 020(A)(2)(c) from the International Code Council's Building Valuation Data and posted each January 30 on the county's website. 020(D)(2) as the higher of the applicant's own stated cost or the cost calculated by a Division plan review engineer using Marshall Valuation Service data. 020(D)(3) sets a minimum processing charge of $60 or 25% of the fee, whichever is greater. 020 building permit, not a recurring aquatic-center operating permit.

Violations & Fines

Failure to pay the required permit fee subjects the applicant to the penalties authorized under the Building Code, Section 500.100, and the Residential Code, Section 500.150, per § 505.020(A)(4). An application that is ready for issuance but is canceled or abandoned by the applicant still draws a minimum charge of $60, or 25% of the permit fee if that is greater, under § 505.020(D)(3). The Division of Building and Code Enforcement recalculates its miscellaneous permit fees every January 1 and may raise them to cover cost increases, capped at no more than a 4% annual increase, under § 505.020(D)(1).

Frequently Asked Questions

Do I need a permit to install a swimming pool in unincorporated St. Charles County?
Yes. Any above-ground or in-ground pool is construction subject to the Building Code, Section 500.100, and requires a permit from the Division of Building and Code Enforcement before work starts, per County Code § 505.020(D)(1)(e). The fee is $100 for above-ground pools and $150 for in-ground pools, or the construction cost times the annual fee multiplier if greater.
How much does a pool permit cost in St. Charles County?
An above-ground pool permit costs $100 and an in-ground pool permit costs $150, or the estimated cost of construction multiplied by the current Permit Fee Multiplier from § 505.020(A)(2)(c), whichever amount is greater. The multiplier is recalculated annually and posted by the Division each January 30.
Does a backyard pool also need an aquatic center operating permit?
No. Chapter 233, the county's Aquatic and Recreational Facilities Code, defines a private residential swimming pool as one used by an individual, family, or a housing group of three or fewer units, and states that private pools are exempt from those regulations. Only the one-time § 505.020 building permit applies.
What if I cancel my pool permit application after applying?
If the application is ready for issuance but canceled or abandoned, § 505.020(D)(3) requires payment of a minimum $60 charge, or 25% of the permit fee if that is greater, to cover the plan examination and administrative processing already performed.

Sources & Official References

Other rules in St. Charles County

All St. Charles County rules

Compare St. Charles County to another location·View the Missouri swimming pools & spas overview

Get notified when Pool Permits in St. Charles County, MO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.