Skip to main content
CityRuleLookup

Tuscaloosa, AL Swimming Pools & Spas: Pool Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Swimming pool permit rules in Tuscaloosa, AL, also covering above-ground pools, in-ground pools, and spa installations, set fencing, barrier, alarm, and inspection requirements.

Key Facts

Permit trigger
Before any excavation or construction begins
Adopted code
2021 Intl. Swimming Pool and Spa Code
Barrier height minimum
72 inches above grade
Residential permit fee
$3.50 per $1,000 valuation, $21 minimum
Appeal deadline
5 days to chief building official

Summary

Tuscaloosa bars any excavation or construction work on a residential pool until the chief building official issues a building permit under City Code Sec. 6-6. The city separately adopted the 2021 International Swimming Pool and Spa Code by reference in Sec. 6-118, and Sec. 6-119 raises the code's barrier-height minimum to 72 inches for every pool built within the corporate limits.

It shall be unlawful to commence the excavation for or the construction of any building, permanent sign, or other structure, including accessory structures... until the chief building official has issued for such work a building permit. (Sec. 6-6) ... the International Swimming Pool and Spa Code, 2021 Edition... is hereby referred to and adopted by reference as the Swimming Pool and Spa Code of the City of Tuscaloosa... (Sec. 6-118) ... "305.2.1.1 barriers will be required to be 72 inches above grade to meet zoning regulations within the corporate limits." (Sec. 6-119(b))

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 102).

Full Breakdown

Chapter 6 of the Tuscaloosa City Code makes it "unlawful to commence the excavation for or the construction of any building, permanent sign, or other structure, including accessory structures" until the chief building official issues a permit (Sec. 6-6), and a residential swimming pool counts as an accessory structure for this purpose. Article XI of Chapter 6 goes further and adopts the International Swimming Pool and Spa Code, 2021 Edition, by reference as the "Tuscaloosa Swimming Pool and Spa Code" under authority of Code of Alabama 1975 Sec.

11-45-8(c) (Sec. 6-118, most recently amended by Ord. No. 9155 on 1-11-22). Sec. " Permit fees follow the same schedule as any other residential building permit under Sec. 6-115: three dollars fifty cents per one thousand dollars of valuation, with a twenty-one-dollar minimum fee, paid when the application is filed. Inspections follow Sec. 6-7, and anyone who disagrees with the chief building official's decision on a pool or spa installation has five days under Sec. 6-120 to file a written appeal, triggering a hearing within ten days, with a further right of appeal to the board of adjustments and appeals if still aggrieved.

Violations & Fines

Digging or building a pool before the permit issues violates Sec. 6-6 and can draw a stop-work order; continuing work after a stop-work order is a separate, additional violation. A pool barrier under 72 inches above grade fails the Sec. 6-119(b) amendment and will not pass the inspection required for sign-off.

Frequently Asked Questions

Does a small above-ground pool need a Tuscaloosa building permit?
Yes. Sec. 6-6 requires a permit before "the construction of any building, permanent sign, or other structure, including accessory structures," and the city's Swimming Pool and Spa Code in Sec. 6-118 applies to pool and spa installations generally, so the chief building official must issue a permit before work starts, whether the pool is in-ground or above-ground.
How high does my pool fence or barrier have to be?
Sec. 6-119(b) adds subsection 305.2.1.1 to the adopted Swimming Pool and Spa Code, requiring barriers to be 72 inches above grade to meet the city's zoning regulations, a taller standard than the code's own default barrier height.
What happens if my pool permit is denied?
Sec. 6-120 gives you five days from the chief building official's decision to file a written appeal. The chief building official must hold a hearing within ten days and can sustain, reverse, or modify the decision; if you're still aggrieved, you can appeal further to the board of adjustments and appeals.

Sources & Official References

Other rules in Tuscaloosa

All Tuscaloosa rules

Compare Tuscaloosa to another location·View the Alabama swimming pools & spas overview

Get notified when Pool Permits in Tuscaloosa, AL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.