Bowling Green, KY Trash & Recycling: Dumpster Rules (2026)
Key Facts
- Governing section
- Sec. 21-4.06(g)
- Trigger
- Any dumpster or oversized waste receptacle in ROW
- Application lead time
- 5 days before non-emergency placement
- Permit fee
- $75 flat (Sec. 21-4.07)
- Surety bond
- $250 minimum, or $100,000 running bond
- Review time
- City acts within 5 business days
- Penalty
- Fines, permit denial, Sec. 21-4.19 enforcement
Summary
Placing any dumpster or oversized waste receptacle in a Bowling Green right-of-way needs its own right-of-way work permit under Sec. 21-4.06(g), a $75 fee, and a surety bond, applied for at least five days before non-emergency placement, matching the permit process for other right-of-way excavation.
g. A right-of-way permit shall be required for placement of any dumpster or oversized waste receptacle in City right-of-way. ... Permit fees in the amount of seventy-five dollars ($75) are required by this Subchapter and shall be paid at the time of application.
Full Breakdown
Sec. 21-4.06(g) singles out waste containers for its own right-of-way permit trigger: a right-of-way permit is required for placement of any dumpster or oversized waste receptacle in a City right-of-way, on top of the general permit duty in Sec. 21-4.06(a) that applies to any activity in the right-of-way requiring a permit under the Cuts, Excavations and Work Within Right-of-Way subchapter. Because a dumpster is not an emergency activity, Sec. 21-4.06(b) requires the application at least five days before the planned placement, though the City Engineer can waive that lead time for good cause, and the Department must approve, deny or conditionally approve within five business days, stating any denial or condition in writing.
Sec. 21-4.06(d) makes the application available from the Department and on the City's website, and Sec. 21-4.06(j) lets the City Engineer deny or revoke the permit for failing to satisfy the Subchapter's requirements or if denial is necessary to protect public health, safety or welfare, with the option to condition approval on specific requirements instead. Sec. 21-4.07 sets the fee at a flat $75, due at the time of application, and Sec. 21-4.08 requires a surety bond before the permit issues, with a minimum bond of $250 for a single permit, or $100,000 for an annual running bond that covers repeated dumpster or excavation permits, released after a bond release inspection ninety days after the work is finished.
Placing a dumpster without proper advance notice is treated the same as work done without a permit under Sec. 21-4.06(b), which the City has flagged for the levy of fines.
Violations & Fines
Placing a dumpster or oversized waste receptacle in the right-of-way without the Sec. 21-4.06(g) permit, or without the notice required by Sec. 21-4.06(b), is treated as work done without a permit and risks fines, permit denial under Sec. 21-4.06(j), and enforcement under Sec. 21-4.19, including a Stop Work Order and civil penalties under Chapter 27 of the Code for noncompliant placement left in the right-of-way.
Frequently Asked Questions
Do I need a permit to put a dumpster in the street in Bowling Green?
What does a right-of-way dumpster permit cost?
Can the City deny a dumpster right-of-way permit?
Sources & Official References
Other rules in Bowling Green
Compare Bowling Green to another location·View the Kentucky trash & recycling overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.