Skip to main content

Dixmont, ME Trash & Recycling: Dumpster Rules (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Plan must show
Location and proposed screening of on-site waste facilities
Disposal standard
Licensed disposal facility with adequate capacity
Service area screening
Minimum five (5) feet wide, dense planting, berms or fencing
Review body
Planning Board
Enforcing officer
Code Enforcement Officer
Exempt
Single-family and two-family dwellings

Summary

Dixmont requires a nonresidential or multifamily applicant to show the location and proposed screening of any on-site solid waste collection or storage facilities, and Section 9.18 requires all solid waste to go to a licensed disposal facility with adequate capacity. The Planning Board reviews the plan and the CEO enforces. The ordinance never uses the word dumpster and prints no container size or setback.

4) Provisions for handling all solid wastes, including hazardous and special wastes and the location and proposed screening of any on-site collection or storage facilities. ... 9.18. ... Solid Waste Disposal (AS) The proposed development must provide for adequate disposal of solid wastes. All solid waste must be disposed of at a licensed disposal facility having adequate capacity to accept the project's wastes.

Full Breakdown

Two provisions of the Dixmont Site Plan Review Ordinance govern commercial waste containers. Section 8.3 lists what the applicant must submit about the proposed development activity, and item 4 calls for provisions for handling all solid wastes, including hazardous and special wastes, and the location and proposed screening of any on-site collection or storage facilities. Section 9.18, Solid Waste Disposal, is an approval standard (AS): the proposed development must provide for adequate disposal of solid wastes, and all solid waste must be disposed of at a licensed disposal facility having adequate capacity to accept the project's wastes.

Section 9.22, Buffering of Adjacent Uses, adds a screening standard that reaches "mechanical equipment and service and storage areas." Buffering must be designed to provide a year-round visual screen and can consist of fencing, evergreens, berms, rocks, boulders, mounds, or a combination. Areas adjacent to service, loading, or storage areas should be screened by dense planting, berms, fencing, or a combination thereof with a width of a minimum of five (5) feet. The ordinance does not say whether a dumpster counts as a service or storage area, so the Planning Board decides that question on each plan.

The review applies to a new nonresidential building or structure greater than 2,500 sq. ft. within any five-year period, any structure greater than 40 feet in height, expansion of an existing nonresidential use by more than 2,500 sq. ft., a new nonresidential use, and nonresidential paved area of more than 2,500 square feet. Single-family and two-family dwellings are exempt under Section 2.2. Under Section 6, the Planning Board can approve, disapprove, or approve with conditions. Mobile home parks have their own refuse terms: collection at least weekly, handled by the park operator.

Violations & Fines

Under Section 5, the Code Enforcement Officer (CEO) gives written notice naming the violation and ordering the corrective action, and can order discontinuance of illegal use or work. If the violation is not corrected, the Municipal Officers, on written notification from the CEO, institute legal or equitable action. The owner or person in control of the premises can be fined under Title 30-A section 4452, each day after notification counts as a separate offense, and administrative consent agreements are authorized.

Frequently Asked Questions

Does Dixmont regulate where a commercial dumpster can sit?
Only through site plan review. The applicant's submission must show the location and proposed screening of any on-site collection or storage facilities for solid waste. The ordinance prints no setback or container size, and the Planning Board decides placement when it approves the plan.
Where must a Dixmont project's solid waste go?
Section 9.18 requires all solid waste to be disposed of at a licensed disposal facility having adequate capacity to accept the project's wastes. The development must also provide for adequate disposal of solid wastes as an approval standard.
Is there a screening width for service and storage areas?
Section 9.22 says areas adjacent to service, loading, or storage areas should be screened by dense planting, berms, fencing, or a combination with a width of a minimum of five (5) feet. The text does not name dumpsters, so the Planning Board applies it case by case.
Which Dixmont projects need site plan review?
A new nonresidential building or structure greater than 2,500 sq. ft. within five years, any structure greater than 40 feet in height, a new nonresidential use, expansion of a nonresidential use by more than 2,500 sq. ft., and paved area for nonresidential use of more than 2,500 square feet. Single-family and two-family homes are exempt.

Sources & Official References

Other rules in Dixmont

All Dixmont rules

Compare Dixmont to another location·View the Maine trash & recycling overview

Get notified when Dumpster Rules in Dixmont, ME changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.