Skip to main content
CityRuleLookup

Horry County, SC Tree Protection: Parkway Planting (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Streetscape buffer width
100 feet along major corridors
Canopy trees required
8 per 100 linear feet
Understory trees required
20 per 100 linear feet
Shrubs required
50 per 100 linear feet
Evergreen share
75% of each planting type
Clear-cut penalty
36-month development plan freeze

Summary

Non-residential, multifamily, townhome and in-common residential projects fronting any road on Horry County's Table 1 corridor list, from US 17 to Carolina Bays Parkway, must plant a streetscape tree buffer under Zoning Ordinance §§ 501.B and 504.C, on top of the county's ordinary landscape and buffer rules.

These county ordinances apply to unincorporated areas of Horry County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

B.Non-residential, multifamily, quadraplex, townhome, and in-common residential projects that are located along Table 1: Applicable Roads must meet the Tree Preservation Standards set in § 505 in addition to the required landscape plantings set by § 504. ... Type C: External Road Streetscape Requirement for Major Residential Development, Multi-Family, Quadruplex, Townhome, & In-common Residential Project: ... A minimum 100 feet in width buffer with at least a 6 feet in height berm with 3:1 slope, and consist of the following breakdown: 8 20 50

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 88).

Full Breakdown

B. The operative planting rule is the Type C External Road Streetscape buffer in Table 4: a 100-foot-wide planted buffer built around a berm at least 6 feet high with a 3:1 side slope, holding at minimum 8 canopy trees, 20 understory trees and 50 shrubs, perennials or ornamental grasses per 100 linear feet of frontage, with 75 percent of each planting type required to be evergreen. A developer may substitute a 100-foot-wide strip of undisturbed, naturally forested land for the planted option if a tree survey shows the existing vegetation already meets those same planting counts.

Non-residential projects along the same corridors get a lighter version: a 10-foot Type C streetscape buffer with at least 3 canopy trees, 3 understory trees and 20 shrubs per 100 feet, only 25 percent of which must be evergreen. Table 4's footnotes let qualifying infill parcels east of Highway 17 Business cut the required buffer width and planting counts by up to 60 percent, or by 50 percent for older, smaller in-fill lots, so the corridor requirement scales down for redevelopment of already-built areas.

Violations & Fines

Clearing a required streetscape buffer, or building along a Table 1 road without the corridor tree plan, violates Article V and carries the same misdemeanor exposure as any zoning violation: up to a $500 fine and 30 days in jail per § 114, with each day of noncompliance a separate offense. Clear-cutting a parcel that fails to meet Table 4's buffer standards also triggers an automatic 36-month freeze on accepting any development plan for that parcel.

Frequently Asked Questions

Which roads trigger Horry County's street-tree buffer requirement?
Any road on the county's Table 1: Applicable Roads list in § 501, which names well over 100 corridors, from US 17, US 501 and US 701 to Carolina Bays Parkway, International Drive and SC 544. Projects fronting those roads must meet the Tree Preservation Standards in § 505 on top of the ordinary landscaping rules in § 504.
How wide does the street-tree buffer have to be?
One hundred feet for major residential, multi-family, quadruplex, townhome and in-common residential projects, built around a berm at least 6 feet tall, holding at least 8 canopy trees, 20 understory trees and 50 shrubs per 100 linear feet of road frontage. Non-residential projects get a narrower 10-foot buffer with lighter planting counts.
What happens if I clear-cut a lot along one of these roads?
If the clearing leaves the parcel short of Table 4's minimum buffer standards, Horry County will not accept any development plan for that parcel for 36 months from the date the clearing finished, on top of the usual zoning penalties for the violation itself.

Sources & Official References

Other rules in Horry County

All Horry County rules

Compare Horry County to another location·View the South Carolina tree protection overview

Get notified when Parkway Planting in Horry County, SC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.