Albemarle County, VA Water Use Rules: Recycled Water Rules (2026)
Key Facts
- Applies to
- Data center water cooling systems only
- Requirement
- Closed loop or recycled water system
- Also required
- Public water and public sewer connection
- Adopted
- Ord. 25-18(1), effective April 2, 2025
- Exemption
- Minor accessory data centers under 25% floor area
Summary
Albemarle County's only codified "recycled water" requirement sits inside its data center zoning standards, not a citywide reuse program. Sec. 18-5.1.65(B)(2) requires that any water cooling at a data center use a closed loop or recycled water system, a narrow mandate that applies in Albemarle County outside Charlottesville and Scottsville only to this one land use.
2.Any water cooling must use a closed loop or recycled water system.
Full Breakdown
The county's zoning ordinance does not maintain a general recycled-water or graywater reuse program for households or most businesses; the phrase "recycled water" appears in the Albemarle County Code specifically inside the data center standards adopted by Ord. 25-18(1) on April 2, 2025. Sec. 65(B) requires that a data center be served by public water and public sewer, and subsection (B)(2) adds that any water-based cooling system serving the facility must be either a closed loop system, which recirculates the same water rather than continuously drawing fresh supply, or a recycled water system.
Both options are aimed at limiting a data center's draw on the county's public water system, since data center cooling can use large, continuous volumes of water. This requirement sits alongside the section's public water and sewer mandate, and a data center that qualifies as a minor accessory use under Sec. 65(A), sitting on the same site as its primary use and staying under 25 percent of that use's floor area, is exempt from the standard under subsection (A)(2). The county has not published a compliance test or metering standard for verifying closed-loop or recycled-water use in the code text itself, leaving verification to the site plan and zoning clearance review process that applies to standalone data centers generally.
Violations & Fines
A data center whose water cooling draws directly on the public supply, rather than running a closed loop or recycled system, violates Sec. 18-5.1.65(B)(2) and is a zoning violation under Sec. 18-36.1. The Zoning Administrator can pursue a civil summons of $200.00 for a first violation and $500.00 for each later one from the same facts, capped at $5,000.00 total, or a Class 1 misdemeanor under Sec. 18-36.4 carrying $10.00 to $1,000.00 in fines per day.
Frequently Asked Questions
Does Albemarle County require recycled water use generally?
What counts as compliant cooling for a data center's water system?
Is every data center in Albemarle County subject to the recycled water rule?
Sources & Official References
Other rules in Albemarle County
Compare Albemarle County to another location·View the Virginia water use rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.