Key Facts

Utility purpose
Establish reclaimed water services, PCC 7.10.010
Definition source
WAC 173-219-010, via PCC 7.10.030.G
Permit fee (2026)
$230.00 initial installation and testing
Annual fee (2026)
$230.00 cross-connection testing
2027 fee
$253.00 for each
Code basis
Uniform Plumbing Code, PCC 17C.10.010.E
No-permit penalty
Misdemeanor, up to $1,000/90 days

Summary

Pierce County's Water Utility, created by PCC 7.10.010, exists in part "to establish reclaimed water services to protect the environment," with "Reclaimed Water" defined by cross-reference to WAC 173-219-010 at PCC 7.10.030.G. Anyone installing a reclaimed water system in unincorporated Pierce County needs a plumbing permit, with a $230.00 fee (2026) for initial installation and testing and another $230.00 for annual cross-connection testing.

These county ordinances apply to unincorporated areas of Pierce County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

This Chapter creates a Utility to plan, design, acquire, consolidate, construct, manage, operate, improve, and maintain public water supply systems within Pierce County. The purpose of the Utility is to preserve and utilize existing Pierce County Planning and Public Works water rights, to provide safe and reliable water to Pierce County residents who are served by under-resourced or inadequate public water systems, to consolidate existing public water systems for greater efficiency, and to establish reclaimed water services to protect the environment.

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 2026-515, and legislation passed through May 26, 2026).

Full Breakdown

010, adopted by Ordinance 2024-532, creates the Pierce County Water Utility within the Planning and Public Works Department and lists "establish reclaimed water services to protect the environment" as one of the Utility's four founding purposes, alongside preserving county water rights, serving under-resourced water systems, and consolidating existing public water systems. G states that "'Reclaimed Water' shall have the meaning defined in WAC 173-219-010, as now or hereinafter amended," the same section that defines "Public Water System" and "Satellite System Management Agency" by reference to the state Department of Health water rules in WAC 246-290.

00 for each in 2027). Reclaimed water in Pierce County is therefore not a stand-alone permit program; it sits inside the Water Utility's mission statement and the plumbing permit and cross-connection testing system that already covers backflow devices, gray water, and rainwater harvesting systems in the same fee table.

Violations & Fines

Installing or operating a reclaimed water system without the required plumbing permit and annual cross-connection test falls under the construction code's general enforcement scheme at PCC 17C.10.050: doing prohibited work without a permit is a misdemeanor punishable by up to $1,000.00 or 90 days in jail, or both, with each day of continued violation a separate offense, and the Building Official may also assess a civil penalty of up to $1,000.00 per violation under the same Section.

Frequently Asked Questions

Does Pierce County have its own reclaimed water rules?
Pierce County's Water Utility, created by PCC 7.10.010, lists establishing reclaimed water service as one of its purposes, but the technical definition of 'Reclaimed Water' is borrowed directly from Washington's WAC 173-219-010 rather than written locally, per PCC 7.10.030.G.
Do I need a permit to install a reclaimed water system?
Yes. Reclaimed water systems are permitted as plumbing work under the Uniform Plumbing Code Pierce County adopts at PCC 17C.10.010.E. The county's fee table, PCC 17C.10.070 Table 17C.10-1-D, charges $230.00 for initial installation and testing in 2026, rising to $253.00 in 2027.
Is there a recurring fee for reclaimed water systems?
Yes, an annual cross-connection testing fee, listed in the same Table 17C.10-1-D at $230.00 for 2026 and $253.00 for 2027, separate from the one-time installation and testing fee charged when the system is first installed.
What happens if I skip the permit for a reclaimed water system?
PCC 17C.10.050 makes unpermitted plumbing work a misdemeanor punishable by up to $1,000.00 or 90 days in jail, or both, with each day it continues a separate offense, and the Building Official can also levy a civil penalty of up to $1,000.00 per violation.

Sources & Official References

Other rules in Pierce County

All Pierce County rules

Compare Pierce County to another location·View the Washington water use rules overview

Get notified when Recycled Water Rules in Pierce County, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Recycled Water Rules in Cities Across Pierce County