Santa Rosa, CA Water Use Rules: Recycled Water Rules (2026)
Key Facts
- Mandatory use trigger
- Connections on/after Oct. 19, 2007
- Eligible area
- Entire Santa Rosa Urban Growth Boundary
- Permit required
- Site-specific Recycled Water Use Permit
- Backflow testing
- Quarterly inspection, annual test
- Cure period
- 15 days after written warning
- Enforcement
- Immediate service termination allowed
Summary
Santa Rosa can require any customer who connected to the City water system on or after October 19, 2007 to run recycled water instead of potable water for every approved use. City Code Chapter 14-25 conditions that on a site-specific Recycled Water Use Permit, a designated Site Supervisor, and backflow testing, backed by service termination for violations.
The State of California has declared that the use of potable water for non-potable uses is a waste or unreasonable use of water if recycled water is available. The City owns and operates the recycled water distribution system providing recycled water for approved purposes. The City also owns and operates the potable water distribution system. ... The City reserves the right to require all customers who connect to the City water system on or after October 19, 2007, to use recycled water in-lieu of potable water for all approved uses.
Full Breakdown
Chapter 14-25 of the Santa Rosa City Code starts from a policy finding in Section 14-25.020: the State of California has declared that using potable water for a non-potable purpose is itself a waste of water whenever recycled water is available for that purpose. Building on that finding, Section 14-25.040 lets the City require any customer who connects to the City water system on or after October 19, 2007, to use recycled water instead of potable water for every approved use, approved uses being whatever the City's Recycled Water User's Guide, or State law, designates as safe for tertiary-treated recycled water.
Eligibility runs citywide: Section 14-25.030 makes every area within the Santa Rosa Urban Growth Boundary eligible for a recycled water connection once service reaches it, though the Director of Utilities can decline a connection that isn't economically or operationally feasible, and reviews single-family irrigation requests case by case. Before anyone can actually run recycled water on their property, Section 14-25.060 requires the City to issue a site-specific Recycled Water Use Permit, and Section 14-25.070 requires the customer to name a Site Supervisor who can manage the on-site system and liaise with the City. Section 14-25.090 adds a safety backstop: if the City finds a backflow hazard, the customer must install a backflow prevention device, keep it maintained, have it inspected quarterly, and test it at least annually, submitting the results under the City's backflow program. Section 14-25.100 lets City staff enter the property during normal working hours, or anytime in an emergency, to check compliance.
Violations & Fines
Under Section 14-25.110, the Director of Utilities can terminate a customer's recycled water service immediately for a violation of Chapter 14-25, no warning required. As an alternative, the Director may instead issue a written warning; if the customer has not fixed the violation within 15 days of that warning, or another period the Director sets, the Director can then terminate service without any further notice.
Frequently Asked Questions
Can Santa Rosa force me to switch to recycled water?
What is a Recycled Water Use Permit?
What happens if I misuse my recycled water connection?
Sources & Official References
Other rules in Santa Rosa
California rules heatmap·Compare Santa Rosa to another location·View the California water use rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Recycled Water Rules in Nearby Cities
How other cities in Sonoma County handle recycled water rules.