Skip to main content
CityRuleLookup

Austin, TX Zoning Overlays & Bonuses: Downtown Design Guide (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Trigger
seeking bonus height/floor area under Downtown Density Bonus Program
Design review body
Design Commission recommends to the Planning director
Standard applied
"substantial compliance" with Urban Design Guidelines
Streetscape requirement
covenant to build Great Streets Standards improvements
Green building floor
minimum 2-star Austin Energy Green Building rating
Appeal window
30 days from gatekeeper denial to city council

Summary

A downtown Austin project that wants extra height or floor area under the Downtown Density Bonus Program must first clear "Gatekeeper Requirements": substantial compliance with the city's Urban Design Guidelines as reviewed by the Design Commission, plus a covenant to build Great Streets streetscape improvements and a minimum two-star Austin Energy Green Building rating.

(C)Program Requirements.(1)Gatekeeper Requirements.(a)To receive bonus area, the director must determine that the project substantially complies with the Urban Design Guidelines.(i)The applicant must submit to the director a schematic level site plan, building elevations, and other drawings, simulations or other documents necessary to fully describe the urban design character of the project and relationship of the project to its surroundings.(ii)The Design Commission shall evaluate and make recommendations regarding whether the project complies with the Urban Design Guidelines and the director shall consider comments and recommendations of the Design Commission.(b)Except as provided in Subsection (C)(1)(c), the applicant shall execute a restrictive covenant committing to provide streetscape improvements along all public street frontages, consistent with the Great Streets Standards.

Full Breakdown

" To make that determination, an applicant must submit "a schematic level site plan, building elevations, and other drawings, simulations or other documents necessary to fully describe the urban design character of the project and relationship of the project to its surroundings," and the Design Commission reviews the submission and makes a recommendation the director must consider. Beyond design review, the same Gatekeeper Requirements force a streetscape commitment: the applicant must execute a restrictive covenant to build streetscape improvements along every public street frontage consistent with the Great Streets Standards, or, for property fronting a Texas Department of Transportation road, pay a fee-in-lieu plus a one-time maintenance fee set by separate ordinance.

A third gatekeeper item requires a signed commitment to at least a two-star rating under the Austin Energy Green Building program before any bonus area can be approved. If a building's design changes after a bonus is granted, the director must re-review the new design for substantial compliance with the Urban Design Guidelines before a building permit can be approved, and an applicant denied at the gatekeeper stage may appeal to city council within 30 days of the director's denial under Section 25-2-282 and Section 25-2-283 procedures.

Violations & Fines

A downtown project that fails to substantially comply with the Urban Design Guidelines simply cannot draw bonus floor area or height: the director denies gatekeeper approval, which blocks site plan and building permit approval for the bonus portion of the project until the design is revised or the applicant successfully appeals to city council within the 30-day window.

Frequently Asked Questions

Does Austin have a downtown design guide?
Yes, enforced through Section 25-2-586's Downtown Density Bonus Program rather than as a freestanding citywide code. A project seeking bonus height or floor area must substantially comply with the city's Urban Design Guidelines, reviewed by the Design Commission before the Planning director signs off.
Who reviews downtown projects for design compliance?
The Design Commission evaluates a project's schematic site plan, building elevations, and other drawings and makes a recommendation, which the director of Planning and Development Review must consider before determining whether the project substantially complies with the Urban Design Guidelines.
What happens if a downtown project is denied design approval?
The applicant cannot receive bonus floor area or height until the design is revised to substantially comply, but Section 25-2-586(J) allows an appeal to city council within 30 days of the director's denial, following the hearing procedures in Sections 25-2-282 and 25-2-283.

Sources & Official References

Other rules in Austin

All Austin rules

Texas rules heatmap·Compare Austin to another location·View the Texas zoning overlays & bonuses overview

Get notified when Downtown Design Guide in Austin, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.