Coeur d'Alene, ID Accessory Structures: ADU Impact Fees (2026)
Key Facts
- ADU sewer capitalization fee
- 2.20 per unit, calculated at $6,460
- Single family dwelling
- 2.27 per unit, calculated at $6,665
- Residential PE charge
- $2,936.00 for FY 2023-2024 through FY 2027-2028
- Payment timing
- With the building permit or plumbing permit application
- Impact fee calculation
- Within thirty days of complete residential permit plans
- ADU short-term rental
- Allowed only if the required impact fee is paid
Summary
In the City of Coeur d'Alene, connecting an accessory dwelling unit to the public sewer triggers a sewer capitalization fee of 2.20 population equivalents per unit, printed as $6,460 in the code's schedule. The development impact fee under Title 14 is a separate charge, and an ADU can be a short-term rental only if the required impact fee is paid.
A. The owners of property connecting to the Coeur d’Alene public sewer system, directly or by connecting to a private system that connects to the City sewer system, except property for which a monthly sewer service charge was being made prior to June 1, 1979, or except property for which a wastewater treatment plant expansion fee has been assessed by a local improvement district, shall be assessed a sewer capitalization fee (in addition to any hookup fee), in an amount as set forth in the following schedule: CAPITALIZATION FEE SCHEDULE Customer Type PE Units Calculated CF ... Residential Single family dwelling[1] 2.27 per unit $6,665 Multiple family dwelling (2 units) 2.27 per unit $6,665 Accessory dwelling unit (ADU) 2.20 per unit $6,460
Full Breakdown
Section 13.16.010 assesses a sewer capitalization fee, in addition to any hookup fee, on owners of property connecting to the Coeur d'Alene public sewer system. The schedule lists an accessory dwelling unit at 2.20 per unit and a calculated fee of $6,460. A single family dwelling is 2.27 per unit at $6,665, and a multiple family dwelling of more than two units is 2.20 per unit at $6,460. The fee rests on population equivalents, and the population equivalent charge behind the residential rates is $2,936.00 for FY 2023-2024 through FY 2027-2028. Section 13.16.030 sets that charge on a five year study period using the system buy-in method.
Payment timing is fixed by section 13.16.050: the fee goes to the City Treasurer or designee with the building permit application, or with the plumbing permit application when no building permit is required, and the permit does not issue until the fee is paid. Nonpayment lets the city discontinue sewer service, and the charge becomes a lien on the property (13.16.060). Revenue goes to the sewer system capital improvement fund, restricted to expansion of the public sewer system, storm sewer separation and sewage treatment facilities (13.16.070).
The development impact fee is a different charge. Title 14 defines a Development Impact Fee to exclude connection or hook up charges, collects it at issuance of a building permit, and bars the permit until it is paid (14.03.010). The city calculates it within thirty days of complete permit plans for residential development under section 14.05.010, using the adopted Development Impact Fee Report that section 14.04.010 incorporates by reference, and the code text does not print an ADU dollar figure. Section 17.08.1040A.2 ties the two together for rentals: after the effective date of the short-term rental article, an ADU can be used as a short-term rental only if the required impact fee is paid for it, and a majority owner or immediate family member must then occupy the principal dwelling or ADU more than six months of any year.
Violations & Fines
Section 13.16.080 makes violating the sewer capitalization chapter a misdemeanor, with each day a separate offense, and section 1.28.010 sets the base penalty: a fine of not more than $1,000, imprisonment not to exceed 180 days, or both. Unpaid fees withhold the building or plumbing permit and can end sewer service. Renting an ADU short term without the required impact fee paid violates section 17.08.1040A.2.
Frequently Asked Questions
How much is the sewer fee for an ADU in Coeur d'Alene?
When do I pay the ADU sewer capitalization fee?
Is the sewer capitalization fee the same as the development impact fee?
Can I use my ADU as a short-term rental?
Sources & Official References
Other rules in Coeur d'Alene
Compare Coeur d'Alene to another location·View the Idaho accessory structures overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.