Grays Harbor County, WA Accessory Structures: ADU Impact Fees (2026)
Key Facts
- ADU ERU threshold
- Over 600 sq ft = 1 ERU
- Principal home under 4,000 sq ft
- 1 ERU
- Principal home 4,000 sq ft or more
- 2 ERU
- Minimum charge
- No property below 1 full ERU
- Connection charge markup
- Cost plus 15% administrative charge
- Delinquency penalty
- 10% plus 8%/year interest
Summary
Grays Harbor County does not charge a flat ADU impact fee; instead it converts accessory dwelling units into Equivalent Residential Units for both the one-time general facility charge and the monthly water/sewer bill, adding a full ERU once the ADU passes 600 square feet.
For the purpose of determining general facility charges for water and sewer capacity, the county hereby determines Equivalent Residential Unit (ERU) values based on the following: ... C.Each accessory dwelling unit greater than six hundred s.f. = one ERU.
Full Breakdown
Grays Harbor County's utility rate chapter, 13.20/13.22, prices water and sewer capacity in Equivalent Residential Units (ERUs) rather than a flat per-ADU impact fee. Under § 13.22.120, an accessory dwelling unit larger than 600 square feet counts as one full ERU for the general facility charge, the one-time capacity charge new connections pay; the same 600-square-foot threshold applies again for ongoing service billing, where each accessory dwelling unit over that size is also billed as one ERU. A principal residence under 4,000 square feet is one ERU on its own, and a residence of 4,000 square feet or more counts as two ERUs, so a large house with a qualifying ADU can be billed as three ERUs combined.
No property is charged less than one full ERU regardless of use, per § 13.22.120(I). The actual dollar value of an ERU, both the connection charge and the monthly rate, is set by resolution of the board of commissioners under § 13.22.100, and new connections are also billed a separate connection charge covering meters, piping and installation labor at the county's time-and-materials rate plus a 15 percent administrative charge. Delinquent utility charges draw a 10 percent penalty plus 8 percent annual interest under § 13.22.400, and the county may suspend service 45 days after delinquency under § 13.22.500 following written notice and a hearing opportunity.
Violations & Fines
An ADU owner who connects to county water or sewer without paying the applicable general facility charge and ERU-based connection charge cannot have service activated; § 13.22.100 bars activation until those charges are paid in full. Delinquent accounts accrue a 10 percent penalty and 8 percent annual interest, and the county may suspend water and/or sewer service 45 days after a bill becomes delinquent under § 13.22.500, after ten days' written notice and an opportunity for a hearing before the board designee.
Frequently Asked Questions
Does Grays Harbor County charge a separate impact fee for an ADU?
How much is an ERU in dollars?
Is a small ADU exempt from the ERU charge?
Sources & Official References
Other rules in Grays Harbor County
Compare Grays Harbor County to another location·View the Washington accessory structures overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.