Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

ADU ERU threshold
Over 600 sq ft = 1 ERU
Principal home under 4,000 sq ft
1 ERU
Principal home 4,000 sq ft or more
2 ERU
Minimum charge
No property below 1 full ERU
Connection charge markup
Cost plus 15% administrative charge
Delinquency penalty
10% plus 8%/year interest

Summary

Grays Harbor County does not charge a flat ADU impact fee; instead it converts accessory dwelling units into Equivalent Residential Units for both the one-time general facility charge and the monthly water/sewer bill, adding a full ERU once the ADU passes 600 square feet.

These county ordinances apply to unincorporated areas of Grays Harbor County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

For the purpose of determining general facility charges for water and sewer capacity, the county hereby determines Equivalent Residential Unit (ERU) values based on the following: ... C.Each accessory dwelling unit greater than six hundred s.f. = one ERU.

Full Breakdown

Grays Harbor County's utility rate chapter, 13.20/13.22, prices water and sewer capacity in Equivalent Residential Units (ERUs) rather than a flat per-ADU impact fee. Under § 13.22.120, an accessory dwelling unit larger than 600 square feet counts as one full ERU for the general facility charge, the one-time capacity charge new connections pay; the same 600-square-foot threshold applies again for ongoing service billing, where each accessory dwelling unit over that size is also billed as one ERU. A principal residence under 4,000 square feet is one ERU on its own, and a residence of 4,000 square feet or more counts as two ERUs, so a large house with a qualifying ADU can be billed as three ERUs combined.

No property is charged less than one full ERU regardless of use, per § 13.22.120(I). The actual dollar value of an ERU, both the connection charge and the monthly rate, is set by resolution of the board of commissioners under § 13.22.100, and new connections are also billed a separate connection charge covering meters, piping and installation labor at the county's time-and-materials rate plus a 15 percent administrative charge. Delinquent utility charges draw a 10 percent penalty plus 8 percent annual interest under § 13.22.400, and the county may suspend service 45 days after delinquency under § 13.22.500 following written notice and a hearing opportunity.

Violations & Fines

An ADU owner who connects to county water or sewer without paying the applicable general facility charge and ERU-based connection charge cannot have service activated; § 13.22.100 bars activation until those charges are paid in full. Delinquent accounts accrue a 10 percent penalty and 8 percent annual interest, and the county may suspend water and/or sewer service 45 days after a bill becomes delinquent under § 13.22.500, after ten days' written notice and an opportunity for a hearing before the board designee.

Frequently Asked Questions

Does Grays Harbor County charge a separate impact fee for an ADU?
Not a flat impact fee. The county instead assigns Equivalent Residential Units under § 13.22.120: an accessory dwelling unit over 600 square feet is billed as one additional ERU for both the one-time general facility charge and the ongoing water/sewer rate on the parcel.
How much is an ERU in dollars?
This chapter doesn't set the dollar figure. Section 13.22.100 leaves the ERU rate, along with connection and general charges, to be set and updated by resolution of the board of county commissioners, so the current amount must be confirmed against the utility rate resolution in effect.
Is a small ADU exempt from the ERU charge?
The 600-square-foot threshold in § 13.22.120(C) applies to ADUs larger than that size; the chapter does not state a separate ERU exemption for smaller accessory dwelling units, and no property is billed less than one full ERU under § 13.22.120(I).

Sources & Official References

Other rules in Grays Harbor County

All Grays Harbor County rules

Compare Grays Harbor County to another location·View the Washington accessory structures overview

Get notified when ADU Impact Fees in Grays Harbor County, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.