Skip to main content
CityRuleLookup

Iron County, UT Accessory Structures: ADU Rules (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

ADU rules in Iron County, UT, also called accessory dwelling unit regulations or granny flat ordinances, cover setbacks, owner-occupancy, parking, and permit requirements.

Key Facts

Addition ADU size cap
800 sq ft
Footprint ADU size cap
50% of primary home
Minimum lot size
over 6,000 sq ft
Mobile homes
ADUs prohibited
Enforcing office
Zoning administrator, Ch. 17.72
Max misdemeanor fine
$1,000 or 1 year

Summary

In unincorporated Iron County, accessory dwelling units are a permitted use in every residential zone but must follow Iron County Code Section 17.36.400's size, utility, and lot rules. An ADU added onto a home cannot exceed eight hundred square feet, and one built inside the primary dwelling's footprint cannot exceed fifty percent of that home's size. Mobile homes and lots of six thousand square feet or less cannot add an ADU.

These county ordinances apply to unincorporated areas of Iron County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

B.General Requirements.1.An accessory dwelling unit (ADU) shall:a.Be connected to the same utility connection for water, sewer, power, gas, etc. as the primary dwelling for which the ADU is secondary. ... c.Provide at least one off-street parking space, in addition to those required by the primary dwelling or guesthouse on the same lot;d.Replace any parking spaces contained within a garage or carport if the ADU is created within the garage or carport;e.Be no greater than eight hundred square feet in size if created as an addition to the existing dwelling and not within the footprint of the primary dwelling structure, prior to the addition;f.Be less than fifty percent in size of the primary dwelling when within the same footprint of the primary dwelling ... 2.An accessory dwelling unit (ADU) shall be prohibited:a.To be created within a mobile home as defined in Section 17.80.010;b.To be created if the lot containing the primary dwelling is six thousand square feet or less in size ... d.To be constructed as a duplex according to the current adopted building code.

Full Breakdown

Section 17.36.400(B)(1) requires an ADU to share the same water, sewer, power and gas connections as the primary dwelling; if it ties into an existing septic system, the owner must get written verification from the Southwest Utah Public Health Department that the system is sized for the added load. The ADU must provide at least one extra off-street parking space beyond what the primary dwelling requires, and any garage or carport parking lost to the conversion must be replaced elsewhere on the lot. An addition-type ADU is capped at eight hundred square feet; a footprint ADU is capped at fifty percent of the primary dwelling's size.

It must meet all applicable building, health and fire codes and be designed so the home still reads as a single-family dwelling from the street. Section 17.36.400(B)(2) bars an ADU inside a mobile home as defined in Section 17.80.010, on any lot of six thousand square feet or less, or built as a duplex under the current adopted building code. Section 17.36.400(C) distinguishes an ADU from a guest house: an ADU is permitted by right in any residential zone that allows a single-family dwelling, while a guest house needs an administrative land use permit, must sit at least fifteen feet from the primary dwelling, and has no size cap. The zoning administrator reviews compliance under Chapter 17.72.

Violations & Fines

A zoning administrator who finds an ADU out of compliance issues a written notice of zoning violation under Section 17.72.050, giving the owner thirty days to correct it, and may first offer a voluntary correction agreement under Section 17.72.060. Uncorrected violations become a misdemeanor punishable by up to a one thousand dollar fine or one year in jail, or an infraction up to seven hundred fifty dollars, under Section 1.08.010, with each day of noncompliance a separate offense.

Frequently Asked Questions

Can I build an ADU inside a mobile home in unincorporated Iron County?
No. Section 17.36.400(B)(2)(a) specifically prohibits creating an ADU within a mobile home as defined in Section 17.80.010, regardless of lot size or zone.
How big can my Iron County ADU be?
An ADU added on as new construction is capped at eight hundred square feet under Section 17.36.400(B)(1)(e). One built inside the existing footprint of the primary home cannot exceed fifty percent of that home's size under subsection (f).
What happens if my lot is too small for an ADU?
Section 17.36.400(B)(2)(b) bars an ADU on any lot of six thousand square feet or less, so a smaller parcel cannot add one no matter how the structure is designed.

Sources & Official References

Other rules in Iron County

All Iron County rules

How Iron County compares: Easiest Cities to Build an ADU·Compare Iron County to another location·View the Utah accessory structures overview

Get notified when ADU Rules in Iron County, UT changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.