Josephine County, OR Accessory Structures: ADU Rules (2026)
ADU rules in Josephine County, OR, also called accessory dwelling unit regulations or granny flat ordinances, cover setbacks, owner-occupancy, parking, and permit requirements.
Key Facts
- Minimum lot size
- 2 acres
- Maximum ADU size
- 900 square feet
- Max distance from main home
- 100 feet
- ADUs allowed per lot
- 1
- Review type
- Ministerial, Chapter 19.22 JCC
Summary
In rural Josephine County's Rural Residential zones (RR-1, RR-2.5, RR-5), a homeowner may build one accessory dwelling unit under § 19.61.020(B) of the Rural Land Development Code, but only on a lot of at least two acres, capped at 900 square feet, and sited within 100 feet of the existing single-family home; only one ADU is allowed per lot.
B. Accessory dwelling unit (ADU) as defined in JCC § 19.11.030, subject to the following standards: 1. The lot or parcel for the ADU is at least two acres in size and not located within an urban reserve as mapped in the County's GIS system; ... ... 4. The ADU is limited to 900 square feet in floor area and shall be located no more than 100 feet from the existing single-family dwelling; ... ... 9. Only one ADU is allowed on any lot or parcel.
Full Breakdown
020(B) permits an accessory dwelling unit in the Rural Residential zone as a ministerially reviewed use, but attaches ten conditions. 600; the ADU must meet sanitation and wastewater rules; and it is capped at 900 square feet and must sit within 100 feet of the primary dwelling. 495 requires. 76 JCC, Wildfire and Emergency Safety Standards: a vegetation-mitigation plot plan, compliance with building safety requirement R-327 and applicable state specialty codes, a driveway meeting evacuation-access standards, and proof of an approved domestic water supply from the Oregon Department of Water Resources.
Only one ADU is allowed per lot, and the county will not approve a subdivision, partition, or other division that would put the ADU on a separate lot from the primary dwelling. 020(D) lets a historic home be converted into an ADU instead, under its own size and rebuild limits.
Violations & Fines
Constructing an ADU that exceeds 900 square feet, sits more than 100 feet from the primary dwelling, or is built on a lot under two acres does not qualify for ministerial approval under § 19.61.020(B); Planning can deny or revoke the development permit issued under Chapter 19.41 JCC, and an ADU built without meeting these standards is an unpermitted structure subject to code enforcement.
Frequently Asked Questions
How big can a Josephine County ADU be?
What size lot do I need for an ADU?
Can I build more than one ADU on my property?
Sources & Official References
Other rules in Josephine County
How Josephine County compares: Easiest Cities to Build an ADU·Compare Josephine County to another location·View the Oregon accessory structures overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.