Bolingbrook requires a building permit under its adopted 2018 International Building Code for construction, alteration, demolition and repair of buildings, enforced through the village building commissioner. Building without a permit draws a fine of $75 to $1,000 under Code § 10-40(11), and applicants must clear plan review and site approvals before framing or occupancy.

There is adopted, for the above-mentioned purpose, the "International Building Code, 2018 Edition," as published by the International Code Council, Inc., which code shall be the building code of the village. One copy of the International Building Code is on file in the office of the village clerk. ... Section 114.4. Violation penalties. Any person, firm or corporation who shall violate any provision of this article shall, upon conviction thereof, be subject to a fine of not less than $75.00 nor more than $1,000.00. Each day that a violation continues after due notice has been served, in accordance with the terms and provisions hereof, shall be deemed a separate offense. The commencement of building without a permit shall be subject to a fine of not less than $75.00 nor more than $1,000.00, in addition to the permit fees in section 109.2 of this code.

Full Breakdown

Bolingbrook adopted the International Building Code, 2018 Edition, as its building code under Ordinance No. 20-010 (Sec. 10-39), with the building commissioner named as code official (Sec. 10-40(2)). The village then wrote dozens of local amendments into Sec. 10-40. Anyone rehabilitating a building damaged by fire, water, flooding or severe weather must undergo a consultation inspection by structural, electrical, plumbing and mechanical inspectors before work begins, and a building permit is required for all demo work tied to that damage (Sec. 10-40(3)). Plans submitted for review cannot exceed 30 inches by 42 inches (Sec.

10-40(5)), and before any permit issues the applicant must have a proposed site plan approved by the village engineer and the planning and zoning administrator; a foundation survey must be approved before framing starts, and an as-built grading plan approved before an occupancy permit is issued (Sec. 10-40(6)). Inspection and plan-exam fees follow the village fee schedule, and a withdrawn application can recover only 50 percent of fees paid, and only if the refund request is filed within 60 days (Sec. 10-40(7)). Third-party inspections are mandatory for EIFS, structural steel connections and sprayed fire-resistive material before occupancy (Sec.

10-40(8)). Temporary occupancy before exterior work is finished can be authorized in winter conditions if the permit holder posts a bond or letter of credit guaranteeing completion (Sec. 10-40(9)).

Violations & Fines

Building without a first-obtained permit is punishable by a fine of not less than $75.00 nor more than $1,000.00, in addition to the permit fees owed under Section 109.2, and each day a violation continues after notice is a separate offense (Sec. 10-40(11)). Continuing work after a stop-work order carries a steeper fine of $250 to $1,000 per day (Sec. 10-40(12)).

Frequently Asked Questions

Do I need a permit to demolish fire-damaged structures in Bolingbrook?
Yes. Before any rehabilitation begins on a building damaged by fire, water, flooding or severe weather, the village requires a consultation inspection by structural, electrical, plumbing and mechanical inspectors, and Code § 10-40(3) states plainly that a building permit is required for all demo work connected to that damage, with all debris removed first.
What happens if I start building without a permit in Bolingbrook?
The building commissioner can fine you $75 to $1,000 under Code § 10-40(11), on top of the permit fee itself, and each day the violation continues after notice counts as a separate offense, so unpermitted work can become expensive quickly if it drags on.
Can I get my permit fee back if I cancel my project?
Only partly. Code § 10-40(7) allows a refund of up to 50 percent of fees paid, but you must file the refund request within 60 days of your original application date; after that window closes, no refund is available at all.

Sources & Official References

Other rules in Bolingbrook

All Bolingbrook rules

Compare Bolingbrook to another location·View the Illinois building safety overview

Get notified when Building Permits in Bolingbrook, IL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Permits in Nearby Cities

How other cities in Will County handle building permits.

Joliet, IL
Some Restrictions