Bowie, MD Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit trigger
Required whenever county permit needed or city standard stricter
County permit
Prerequisite for city permit when county requires one
Stop-work fee
$10 investigation fee added to permit fee
Possible bonds
$500 easement bond and $100 debris bond
Enforcing office
City Manager or designee, City of Bowie
General penalty
Up to $500 fine or 30 days jail, § 1-6

Summary

In the City of Bowie, a City building permit is required for construction beyond any Prince George's County permit whenever city standards are stricter, per City Code § 5-4. Permit fees are set annually in the City budget, plans and site surveys must accompany applications, and the City Manager can issue a stop-work order plus a $10 investigation fee for unpermitted work.

There is hereby established a City building permit requirement. The fee for any permit shall be prescribed by the Council in the annual City budget. ... A building permit must be obtained from the City for any construction for which a permit is required from Prince George's County and for any construction that is subject to a City standard that is stricter than that applied by the county, without regard to whether a county permit is required for such construction. A county building permit is a prerequisite for issuance of a City permit when a county permit is required for the construction.

Full Breakdown

City Code § 5-4 establishes the City of Bowie's own building permit requirement, layered on top of Prince George's County's building authority. A City permit is required whenever the county requires a permit, and separately whenever the proposed construction is subject to a City standard stricter than the county's, regardless of whether the county requires its own permit for that work. Where a county permit is required, that permit must be obtained first, before the City will issue its own. Applications must include scaled plans and specifications, a site plan showing lot lines and grading drawn from an accurate boundary survey, the location of any private sewage disposal system, and, for property inside a Chesapeake Bay Critical Area Overlay Zone, a conservation plan and conservation agreement.

The City Manager reviews every application for impacts on public transportation, fence placement, refuse removal, noise, stormwater, soil erosion, water and sewer systems, public safety, and road requirements, and may not approve a permit for a property with unpaid real property taxes. A $500 easement/right-of-way bond and a separate $100 debris-removal bond can be required before work begins. If construction starts, is partially completed, or is concealed before a permit issues, the City Manager may post a stop-work order on the property and mail it to the owner; work must stop immediately except corrective work, and the owner must pay a $10 investigation fee in addition to the regular permit fee before reapplying. Permit fees themselves are set each year in the City's annual budget ordinance rather than fixed in the Code.

Violations & Fines

Building without the required City permit, working outside an issued permit's scope, or continuing work after a stop-work order is posted violates § 5-4. Building Code violations are generally enforced under Chapter 1, § 1-6: an unclassified misdemeanor carries a fine up to $500, imprisonment up to 30 days, or both, and each day a violation continues is a separate offense. Ignoring a stop-work order adds exposure for the underlying unpermitted work plus the $10 investigation fee before any new application is accepted.

Frequently Asked Questions

Does Prince George's County or the City of Bowie issue my building permit?
Both can apply. Prince George's County handles zoning and the Maryland Building Performance Standards, but the City of Bowie separately requires its own permit under § 5-4 whenever the county requires one or when a City standard is stricter than the county's; the county permit must be obtained first if the county requires one, then submitted to the City.
What must I submit with a Bowie building permit application?
Scaled plans and specifications, a site plan drawn from an accurate boundary survey showing lot lines and grades, the location of any private sewage disposal system, and, for land in the Chesapeake Bay Critical Area Overlay Zone, a conservation plan and conservation agreement, per § 5-4C.
What happens if I build without a permit in Bowie?
The City Manager or a designee can post a stop-work order at the property and mail a copy to the owner; all work must cease except corrective work, and before a new application is accepted the owner must pay a $10 investigation fee on top of the standard permit fee, per § 5-4F.

Sources & Official References

Other rules in Bowie

All Bowie rules

Compare Bowie to another location·View the Maryland building safety overview

Get notified when Building Permits in Bowie, MD changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.