Chelan County, WA Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit expiration
Two years from date of issuance
Renewal
One extra year, 50% of original fee, once only
Exempt: sheds/ag buildings
≤288 sq ft floor area
Exempt: fences
Not over 7 feet high
Exempt: retaining walls
Not over 4 feet high
After-the-fact fee
Double the standard building permit fee

Summary

Chelan County requires a building permit for most construction in the unincorporated county, though Section 3.04.100 exempts small sheds, low fences and retaining walls, sidewalks and similar minor work. Every issued permit expires two years from issuance and can be renewed once, for one additional year, at half the original fee, under Section 3.04.040.

These county ordinances apply to unincorporated areas of Chelan County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Section 105.5, R105.5 Expiration. A. Every building permit issued shall expire two years from the date of issuance. ... Every permit may be renewed for a period of one year beyond the original expiration date for an additional fee equal to 50 percent of the original building permit fee, as long as no changes have been made to the originally approved plans and new building codes have not been adopted. Renewals must be applied for prior to the expiration date of the original permit. No building permit shall be renewed more than once. ... R105.2 Work exempt from permit. ... Permits shall not be required for the following. Exemption from permit requirements of this code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of this code or any other laws or ordinances of this jurisdiction.

Full Breakdown

2 to exempt specific activities from the permit requirement in unincorporated Chelan County: one-story detached accessory structures (sheds, ag storage buildings, playhouses) up to 288 square feet; fences no more than 7 feet high; retaining walls no more than 4 feet high; water tanks up to 5,000 gallons; sidewalks and driveways; decks up to 288 square feet and no more than 30 inches above grade that aren't attached to a dwelling; in-kind reroofing and window/door replacement; bathroom and kitchen fixture swaps; and above-ground spas not connected to plumbing, among others.

Everything outside that list needs a permit. 5 so that every issued building permit expires two years from issuance; the building official can approve an extended expiration for commercial projects with an approved construction schedule, and any permit can be renewed once for one additional year at 50 percent of the original permit fee, provided the approved plans haven't changed, no new code has been adopted, and the renewal is filed before the original expiration date. 050, reviewed and approved by separate resolution of the Board of County Commissioners.

Violations & Fines

Building without a required permit, or working outside a Section 3.04.100 exemption, is a misdemeanor under Section 3.04.020: each day the unpermitted work continues is a separate offense, punishable by up to a $500.00 fine, up to 90 days in jail, or both. Community Development can also assess an after-the-fact permit fee equal to double the standard building permit fee once unpermitted work is discovered.

Frequently Asked Questions

Do I need a permit for a shed in unincorporated Chelan County?
Not if it's a one-story detached accessory structure like a tool shed, ag storage building or playhouse with a floor area of 288 square feet or less; Section 3.04.100 exempts it. Anything larger, or any structure with plumbing or electrical work, still needs a building permit from Community Development.
How long does a Chelan County building permit last?
Two years from the date of issuance under the county's amended IBC/IRC Section 105.5. You can renew once for one additional year by paying half the original permit fee before the two years run out, as long as the approved plans haven't changed and no new code has been adopted.
What if I build without a permit in Chelan County?
It's a misdemeanor under Section 3.04.020, punishable by up to $500.00 and 90 days in jail per day the violation continues, and Community Development can charge an after-the-fact permit fee of double the normal building permit cost once the work is discovered.

Sources & Official References

Other rules in Chelan County

All Chelan County rules

Compare Chelan County to another location·View the Washington building safety overview

Get notified when Building Permits in Chelan County, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.