Chelan County, WA Parking Rules: EV Charging (2026)
Key Facts
- Location requirement
- Within 1,000 ft of a collector road or state highway
- Stall sizing
- Set by off-street parking Table 11.90-4
- Pavement marking
- Green pavement marking required
- Signage standard
- Must follow MUTCD (RCW 47.36.030)
- Parking credit
- EV stalls count toward Section 11.90.060 minimums
Summary
Unincorporated Chelan County allows electric vehicle charging stations as a permitted use when the site sits within one thousand feet of an urban or rural collector road or a state highway. Chelan County Code Section 11.88.110 sets the parking-stall size, signage and pavement-marking standards, and lets a charging stall count toward a project's off-street parking minimum.
§ 11.88.110. Electric vehicle charging stations. (1) Electric vehicle charging stations and related infrastructure are permitted if located within one thousand feet of urban or rural collector roads, as defined in Section 15.30.220, or a state highway and in compliance with the following: (A) Electric charging stations shall provide a parking stall using the size requirements defined in Table 11.90-4; and (B) Electric charging station stalls shall be designated by vertical signage identifying the station as an electric vehicle charging station and indicating that it is only for electric vehicle charging. The signage must be consistent with the Manual on Uniform Traffic Control Devices, as adopted by the Department of Transportation under RCW 47.36.030. Additionally, the electric vehicle charging station must be indicated by green pavement markings. ... (2) Parking spaces designated for electric vehicle charging may be included in the calculation of the off-street parking requirements, as defined in Section 11.90.060.
Full Breakdown
220, or of a state highway. 90-4 of the county's off-street parking chapter. 030. The county also requires the stall surface to carry green pavement markings, and additional wayfinding signage directing the public to the station is allowed. 060, a developer does not need to build extra parking beyond the district minimum just to add charging capacity. The provision was adopted by Resolution 2017-119 and carried forward in the 2020 zoning code update, Resolution 2020-68. 88, and an installation built outside the one-thousand-foot collector-road/highway band, or missing the required signage or pavement marking, is out of compliance with the zoning code.
Violations & Fines
An electric vehicle charging installation built outside the required proximity to a collector road or state highway, or missing the mandated signage or green pavement marking, is a zoning code violation. Community Development can issue a notice and order under Chapter 16.06 requiring correction, and failure to comply brings a $750 civil fine for a first violation and $1,500 for a repeat violation under Chapter 16.16.
Frequently Asked Questions
Where can I install an EV charging station in unincorporated Chelan County?
Does an EV charging stall count toward my required parking?
What signage does an EV charging station need?
Sources & Official References
Other rules in Chelan County
Compare Chelan County to another location·View the Washington parking rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.