Key Facts
- Renovation under $25,000
- $100.00 flat permit fee
- Renovation $25k-$50k
- $150.00 permit fee
- Renovation $50k-$75k
- $250.00 permit fee
- Over $75,000
- Billed as 'substantial renovation' by sq ft
- 1-2 family new construction
- $0.35/sq ft, $250 minimum
- Permit expires
- 6 months if work not started
Summary
Renovating a building in Columbus, Georgia takes a permit from the Department of Inspections and Code, and City Code § 8-14.4(g)(4)a tiers the fee by project cost: $100.00 under $25,000, $150.00 up to $50,000, and $250.00 up to $75,000, before larger jobs switch to a square-footage rate.
3.For renovation projects under $25,000. the permit fee shall be $100.00.4.For renovation projects over $25,000.00, up to and including $50,000 the permit fee shall be $150.00.5. For renovation projects over $50,000.00, up to and including $75,000 the permit fee shall be $250.00. Renovation projects over $75,000.00 shall be deemed substantial renovation projects and fees will be calculated per paragraphs 1 and 2 above.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 75).
Full Breakdown
Section 8-14.4(a)(1) requires anyone who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure to apply to the building official and get a permit before starting. Once a renovation clears that threshold, § 8-14.4(g)(4)a sets a stepped fee at subparagraphs 3 through 5: a flat $100.00 for renovation work under $25,000.00, $150.00 for projects over $25,000.00 up to and including $50,000.00, and $250.00 for projects over $50,000.00 up to and including $75,000.00. Cross the $75,000.00 line and the job is reclassified as a 'substantial renovation,' billed instead under the square-footage schedule in subparagraphs 1 and 2: $0.35 per square foot for one- and two-family residential work (minimum $250.00) and, for commercial space, $0.65 per square foot for assembly and educational occupancies, $0.55 for residential occupancies, $0.50 for business and mercantile, and $0.40 for everything else.
A handful of jobs don't need a permit at all under § 8-14.4(a)(2)a, including painting, papering, tiling and cabinetry; swings and playground equipment; prefabricated swimming pools under 24 inches deep; and window awnings projecting no more than 54 inches without extra support. A permit becomes invalid if the authorized work hasn't started within six months of issuance, or if it's suspended for six months once begun, though the building official can grant extensions of up to 90 days at a time for a written, justified request (§ 8-14.4(f)(1)). A certificate of occupancy, required before a non-residential building is used or its occupancy changed, costs $60.00 under the same fee schedule.
Violations & Fines
Beginning work before the permit issues costs an extra penalty of 100 percent of the normal fee, per § 8-14.4(g)(2). Once work is done, violating the article, including failing to get a certificate of occupancy, is punished under § 8-14.10: a minimum $500.00 fine for a first offense and a minimum $1,000.00 fine for a second or later offense at the same property, with every day of a continuing violation counted separately under § 1-8.
Frequently Asked Questions
How much does a Columbus building permit cost for a small remodel?
What happens once my renovation costs more than $75,000 in Columbus?
How long is a Columbus building permit good for before I have to start work?
What's the penalty for building without a permit in Columbus?
Sources & Official References
Other rules in Columbus
Compare Columbus to another location·View the Georgia building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.