Johnston County, NC Building Safety: Building Permits (2026)
Key Facts
- Permit required for
- Excavation, fill, construction, alteration, renovation
- Issued by
- Planning director
- Ordinary repairs
- Exempted from the requirement
- Single/two-family homes
- Exempt from site plan review
- Precedes
- Building, sign, stormwater permits
- Appeal path
- Board of Adjustment (Sec. 14-297)
Summary
Before grading, filling, or building anything beyond ordinary repairs on land in unincorporated Johnston County, the planning director must first issue a land use permit under Sec. 14-291. Any building, sign, or stormwater permit that the project also needs cannot be issued until that land use permit is approved.
Except as otherwise specifically provided in this chapter, it shall be unlawful to begin any excavation, removal of soil, clearing of site, or placing any fill on lands contemplated for development, or to begin any construction, moving, alteration, or renovation, except for ordinary repairs, of any building or other structure, including accessory structures and signs, until the planning director has issued for such action a land use permit, certifying that such development complies with the applicable provisions of this chapter.
Full Breakdown
Sec. 14-291 makes it unlawful to begin excavation, soil removal, site clearing, or fill placement, or to begin construction, moving, alteration, or renovation of any building or structure, including accessory structures and signs, until the planning director issues a land use permit certifying compliance with the Land Development Code. Sec. 14-292 requires site plan review before that permit issues for most development, but exempts single- or two-family dwellings and their accessories, and lets the planning director approve smaller expansions administratively if they add no more than 15 percent (or 2,500 square feet) of floor area, no more than 15 percent (or 20 spaces) of parking, and no more than 15 percent (or 10,000 square feet) of new land clearing.
Sec. 14-296 ties the land use permit to other permits: where a building permit, stormwater management permit, or sign permit is required, none of those can be issued before the land use permit, and no building may be occupied until a final inspection produces a certificate of occupancy. Conditions of approval can require a performance guarantee under Sec. 14-295, capped at 125 percent of the estimated completion cost and normally running one year from issuance. A denial or approval by the planning director on site plan review can be appealed to the board of adjustment under Sec. 14-297; a special use permit's site plan decision by the board of commissioners goes instead to superior court within 30 days.
Violations & Fines
Starting excavation, fill, or construction without an approved land use permit violates Sec. 14-291 and is punished under the countywide Land Development Code penalty at Sec. 14-614: a misdemeanor carrying a $500.00 fine or up to 30 days imprisonment, plus a civil penalty of $100.00 for a first offense, $300.00 for a second, and $500.00 for later offenses, with each day of continued work a separate violation. The county may also withhold or revoke permits on the property.
Frequently Asked Questions
Does Johnston County require a permit before construction starts?
Do I need site plan review to build a single-family house?
Can I get a building permit before the land use permit?
What happens if I build without a land use permit?
Sources & Official References
Other rules in Johnston County
Compare Johnston County to another location·View the North Carolina building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.