Skip to main content
CityRuleLookup

Miami, FL Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Permit required
For any roof repair or re-roof
Minimum inspections
At least two roofing inspections required
Re-roof sheathing
Licensed contractor affidavit may substitute
Unpermitted work fee
2x (homestead) or 4x (commercial) permit fee

Summary

Miami requires a Building Official permit for any roof repair or re-roof, and the Building Department runs at least two separate roofing inspections, dry-in and roof covering, before the work can be closed.

Permits Required. Any owner or owner's authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any impact-resistant coverings, electrical, gas, mechanical or plumbing system, the installation of which is regulated by this Code, or to cause any such work to be performed, shall first make application to the Building Official and obtain the required Permit.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 23 | Ordinance 11000 (Previous Zoning Code): Supplement 22 | Miami 21 (Zoning Code): ?).

Full Breakdown

The Miami Building Department requires a permit before altering, repairing, or replacing a roof, under the Code of Ordinances § 10-5 general permit rule covering any owner who intends to "construct, enlarge, alter, repair, move, demolish" a structure. Roofing work then triggers its own inspection sequence under § 10-10(d): a minimum of two roofing inspections covering dry-in, insulation, and roof coverings, plus a required flashing check. For re-roof sheathing, a notarized affidavit from a state- or locally-licensed roofing contractor attesting to the additional sheathing fasteners required by the Florida Existing Building Code may be accepted at the Building Official's discretion in lieu of a physical inspection.

Violations & Fines

Working without a permit triggers a fee of two times (homestead) or four times (non-homestead/commercial) the normal permit cost plus $110, and the Building Official can issue an immediate stop-work order under § 10-13.

Frequently Asked Questions

Do I need a permit to replace my roof in Miami?
Yes. Miami's Building Code requires a permit before any roof repair, replacement, or re-roof, and the work must pass a minimum of two roofing inspections, dry-in and roof coverings, before it's approved.
What happens if I reroof without a permit in Miami?
The Building Department charges two to four times the normal permit fee plus $110, and the Building Official can issue a stop-work order that halts the job immediately under Code of Ordinances § 10-13.

Sources & Official References

Other rules in Miami

All Miami rules

Florida rules heatmap·Compare Miami to another location·View the Florida building safety overview

Get notified when Building Permits in Miami, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Permits in Nearby Cities

How other cities in Miami-Dade County handle building permits.

Coral Gables, FL
Some Restrictions
Hialeah, FL
Some Restrictions
Miami Beach, FL
Some Restrictions
Doral, FL
Some Restrictions
Homestead, FL
Some Restrictions