St. Joseph County, IN Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit threshold
Over $500 contract price or cost
Enforcing agency
County building commissioner
Permit validity
6 months to start, 1 year to finish
Max fine
$500 per day, Class C infraction
Appeal path
State Fire Prevention & Building Safety Commission
Painting exemption
Repairs under 15% of building value

Summary

Any construction, alteration, repair, or demolition job in unincorporated St. Joseph County costing more than $500 needs a permit from the building commissioner before work starts. Painting and minor repairs under 15% of a structure's value are exempt unless they change the structure itself.

These county ordinances apply to unincorporated areas of St. Joseph County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(A)No construction, extension, repair, alteration or demolition of any building, structure within the county, or any work related thereto, including but not limited to construction, building, plumbing, heating, air conditioning, ventilating, electrical, brick and masonry work, having a total project contract price or estimated cost of more than $500.00, shall be started until a permit for the proposed construction, extension, repair, alteration or demolition has been issued by the building commissioner. ... (B)No permit shall be required for any outside or inside painting or for the repair or maintenance of an existing structure or building where the total project contract price or estimated cost of the repair or maintenance does not exceed 15 percent of the value of the building or structure upon which the repair or maintenance is to be performed, unless the repair or maintenance would cause a substantial structural modification, alteration or extension of the involved structure or building.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 3).

Full Breakdown

Under St. 05(A), no construction, extension, repair, alteration, or demolition of any building or structure in the unincorporated county, including plumbing, heating, electrical, or masonry work, may begin until the building commissioner issues a permit, if the project's contract price or estimated cost exceeds $500. Applicants must first file written plans, specifications, and a plot plan showing setbacks, easements, and property lines for the commissioner's approval; work that departs from the approved plans is itself a violation. 05(B) exempts interior or exterior painting and repair or maintenance jobs under 15 percent of the structure's value, unless that work causes a substantial structural modification.

05(C). 00098, with separate schedules for demolition, additions, and re-inspections. 16, with up to two six-month extensions; after two years a new permit is required. 06 before anyone can use or occupy the building. 07 and IC 22-13-2-7.

Violations & Fines

Starting covered work without a permit, or performing work that departs from approved plans, is a Class C infraction under § 151.11, punishable by a fine of up to $500 under § 151.99(B), with each day of continued unlawful work counted as a separate offense. The building commissioner can issue a stop-work order under § 151.08; a verbal stop order must be followed in writing within 24 hours, and ignoring it is itself unlawful. Occupying a building without a required certificate of occupancy is also unlawful under § 151.06(B).

Frequently Asked Questions

Do I need a permit to repaint my house in St. Joseph County?
No. Section 151.05(B) exempts interior and exterior painting, along with minor repairs or maintenance costing less than 15 percent of the structure's value, from the county's building permit requirement, as long as the work does not cause a substantial structural modification or alteration. Anything above that threshold, or any structural change, still needs a permit from the building commissioner.
What happens if I skip a required building permit?
Working without a required permit is a Class C infraction under § 151.11, carrying a fine of up to $500 under § 151.99(B). Because the ordinance treats each day of unpermitted work as a separate violation, fines add up fast on a project that continues without correction, and the building commissioner can also issue a stop-work order under § 151.08.
How long is a St. Joseph County building permit good for?
Under § 150.16, work must start within six months of the permit's issue date and be completed within one year. The county can grant up to two six-month extensions on request. If the job still is not finished within two years of issuance, the contractor must apply for and pay for an entirely new permit.

Sources & Official References

Other rules in St. Joseph County

All St. Joseph County rules

Compare St. Joseph County to another location·View the Indiana building safety overview

Get notified when Building Permits in St. Joseph County, IN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.