St. Joseph County, IN Building Safety: Plumbing Permits (2026)
Key Facts
- Adopted code
- Indiana Plumbing Code, 675 IAC Art. 16
- Permit required
- Before any plumbing installation or alteration
- Owner exemption
- Owner-occupants of their own dwelling
- Inspections
- 3 required: underground, rough-in, final
- Registration term
- 1 year, starting January 1
- Inspector qualification
- 5 years' experience, Indiana license
Summary
St. Joseph County adopts the Indiana Plumbing Code and requires a building department permit before any plumbing installation or alteration, plus a licensed or county-registered contractor, except for owner-occupants working on their own homes.
§ 151.02(A) Pursuant to IC 22-13-2-3(b), the rules of the Indiana Fire Prevention and Building Safety Commission as set out in the following Articles of Title 675 of the Indiana Administrative Code are hereby incorporated by reference in this code... (3) Article 16 - Indiana Plumbing Code. ... § 151.52(A) No person shall perform or cause to be performed the installation or alteration of any plumbing work on or within the county without obtaining, in advance, a permit from the department as specified in sections 150.15—150.30. (B) All persons performing plumbing services within the county shall be a licensed contractor or registered contractor; provided, however, that the owner-occupant of a dwelling shall not be required to be licensed or registered when he or she is installing, altering or repairing the plumbing of that dwelling.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 3).
Full Breakdown
St. 02(A)(3). 53(A). 52(B). 52(C). 52(D). 51. 53(A)(2).
Violations & Fines
Performing plumbing work without the required county permit, or without holding an Indiana plumbing license and county registration under §§ 151.52 and 151.53, violates this chapter and is subject to the general penalty in § 10.99 under § 151.99(A). Skipping any of the three mandatory inspections, or failing to give the plumbing inspector 24 hours' notice before work is covered up, is likewise a violation of § 151.52(D), and each failed inspection triggers a separate re-inspection fee under § 150.19.
Frequently Asked Questions
Can I do my own plumbing work on my house?
How many times does the county inspect plumbing work?
Does an excavator need a full plumbing contractor license?
Sources & Official References
Other rules in St. Joseph County
Compare St. Joseph County to another location·View the Indiana building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.