Pomona, CA Building Safety: Building Permits (2026)
Key Facts
- Governing section
- City Code Sec. 74-31
- Adopted code
- 2025 California Building Code (2024 IBC base)
- Admin procedure source
- CBC Chapter 1 and CA Administrative Code
- Fee authority
- Gov. Code §§ 66016, 66020; Sec. 2-924 schedule
- Latest amendment
- Ordinance No. 4364, Dec. 15, 2025
- Conflict rule
- State regulations prevail over local construction code
Summary
Pomona requires a building permit for erecting, enlarging, altering, repairing, moving, converting or demolishing a building or structure, administered under the 2025 California Building Code and California Administrative Code adopted by City Code Sec. 74-31. Permit fees are set separately by city council resolution under Government Code Sections 66016 and 66020, not fixed in the ordinance itself.
the following construction codes and appendices subject to the modifications set forth in this Chapter, are hereby adopted: the California Building Code, 2025 Edition, based on the 2024 International Building Code as published by the International Code Council, including Part 8 and Appendix A of said Part, and including Part 10 and Appendix A1 of said Part; the California Administrative Code, 2025 Edition; the California Residential Code, 2025 Edition, based on the 2024 International Residential Code with Appendix CI Swimming Pool Safety Act as published by the International Code Council... Notwithstanding the provisions of the above-referenced construction codes, all permit fees and fees for services provided pursuant to the construction codes shall be in accordance with fees established by city council resolution, pursuant to California Government Code Sections 66016 and 66020.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: City Code: Supplement 31).
Full Breakdown
Sec. 74-31 adopts, for 'erecting, construction, enlargement, alteration, repair, improving, removal, conversion, demolition, occupancy, equipment use, height, and area of buildings and structures,' the California Building Code, 2025 Edition (based on the 2024 International Building Code, including Part 8 and Appendix A, and Part 10 and Appendix A1), the California Administrative Code, 2025 Edition, the California Residential Code, 2025 Edition (with Appendix CI Swimming Pool Safety Act), the California Green Building Standards Code, 2025 Edition, the International Property Maintenance Code, 2024 Edition, and the Uniform Code for the Abatement of Dangerous Buildings, 1997 Edition, among other model codes, together constituting the city's Building Regulations.
Where state regulations differ from these adopted codes, state regulations control. Sec. 74-1(a) sends the actual administrative mechanics, when a permit must be pulled, what triggers plan review, and inspection sequencing, to Chapter 1 of the California Building Code and the California Administrative Code, 2025 Edition, which the city adopted rather than writing its own separate permit-trigger ordinance. Every adopted model code and its appendices is kept as an official city record in the office of the city clerk and a copy is on file with the building official for public inspection, as Health and Safety Code Section 18942(d)(1) requires.
Permit fees and fees for services under these construction codes are not set in Sec. 74-31 itself; they follow whatever schedule the city council adopts by resolution under Government Code Sections 66016 and 66020, referenced back to Section 2-924 of the fee schedule under Sec. 74-2. The section was most recently reenacted by Ordinance No. 4364 on December 15, 2025, updating the adopted code editions to their 2025 versions.
Violations & Fines
Building, enlarging, altering or demolishing a structure without the required permit under the adopted 2025 California Building Code is a violation the building official can cite and stop-work, and, under the Code's general penalty, Sec. 1-7, is punishable as a misdemeanor with a fine up to the Penal Code Section 19 limit, imprisonment up to six months, or both, with each day of continued unpermitted work a separate offense.
Frequently Asked Questions
What building code edition does Pomona currently enforce?
Where does Pomona set its building permit fees?
Can I see the adopted building code at Pomona city hall?
Sources & Official References
Other rules in Pomona
California rules heatmap·Compare Pomona to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Building Permits in Nearby Cities
How other cities in Los Angeles County handle building permits.