Downey, CA Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permitting agency
Building and Safety Division / Building Official
Permit validity
Void if work not started within 12 months
Unstarted application
Abandoned 180 days after filing
Shed exemption
Detached sheds up to 120 sq ft
Fence/wall exemption
42 inches or under needs no permit
Unpermitted work fee
Investigation fee equal to permit fee

Summary

Downey requires a building permit before anyone constructs, alters, repairs, moves or demolishes a building, or installs an electrical, gas, mechanical or plumbing system. Applications go to the Building Official in the Building and Safety Division. A handful of small jobs, like low fences and mini sheds, are exempt.

Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by the codes, or to cause any such work to be done, shall first make application to the Building Official and obtain the required permit.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4807734; v5 updated 2026-01-27).

Full Breakdown

28(a) requires any owner or agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building, or to install, alter or replace an electrical, gas, mechanical or plumbing system, to first apply to the Building Official and obtain a permit before starting work. 28(b) exempts specific minor work: one-story detached accessory sheds and playhouses up to 120 square feet, walls and fences no taller than 42 inches, retaining walls under 4 feet, water tanks on grade under 5,000 gallons, new sidewalks and driveways under 800 square feet, above-ground prefabricated pools under 24 inches deep and under 5,000 gallons, and reroofing of 100 square feet or less within any 12-month period.

32, and state the estimated valuation. 28(c)(ii), an application is deemed abandoned 180 days after filing unless pursued in good faith or a permit issued, though the Building Official may grant one 180-day extension for justifiable cause. 28(f) becomes invalid if work is not commenced within 12 months, or if work is abandoned for 180 days after it starts; a permit issued as the result of a code enforcement action instead expires in 60 days. 36(d) imposes a separate investigation fee, equal to the permit fee, on anyone who starts work before obtaining the required permit, whether or not a permit is later issued. 40 requires a certificate of occupancy before a building may be used.

Violations & Fines

Section 8999.44 makes it unlawful to erect, alter, repair, move or occupy any building or system regulated by the codes in violation of Downey's requirements. The Building Official issues a written notice of violation ordering the illegal condition abated; if it is not corrected, the Building Official refers the matter to the City Attorney to sue to restrain, correct, or abate the violation, with penalties as prescribed by law under Section 8999.44(d). Section 8999.44.5 separately makes it unlawful to own, use or maintain any unpermitted structure or electrical, plumbing or mechanical system, including one whose permit expired and became void, and starting work without a permit first triggers the investigation fee under Section 8999.36(d).

Frequently Asked Questions

Does Downey require a permit to build a backyard shed?
Not if it is a one-story detached accessory structure, such as a tool shed or playhouse, with a floor area of 120 square feet or less, under Municipal Code Section 8999.28(b)(1)(i). Larger sheds or any shed with electrical or plumbing work still need a building permit from the Building and Safety Division.
What happens if I start construction in Downey without a permit?
Section 8999.36(d) requires an investigation fee equal to the normal permit fee before any permit can later be issued, on top of the standard permit fee itself. The work also becomes an unlawful act under Section 8999.44, exposing the owner to penalties and a Building Official order to stop or correct the work.
How long is a Downey building permit good for?
Under Section 8999.28(f), a permit becomes invalid if the authorized work is not commenced within 12 months of issuance, or if commenced work is then abandoned for 180 days. The Building Official can grant one extension of up to 180 days if the permittee shows circumstances beyond their control and pays the required fee.
Do I need a permit to replace my driveway in Downey?
No, if the new or replacement driveway is less than 800 square feet, does not disturb additional area, and keeps the original line, grade and drainage capacity, per Section 8999.28(b)(1)(vi). Larger driveway replacements or ones that change grade or drainage require a permit application to the Building Official.

Sources & Official References

Other rules in Downey

All Downey rules

California rules heatmap·Compare Downey to another location·View the California building safety overview

Get notified when Building Permits in Downey, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Permits in Nearby Cities

How other cities in Los Angeles County handle building permits.

West Covina, CA
Some Restrictions
El Monte, CA
Some Restrictions
Inglewood, CA
Some Restrictions
Norwalk, CA
Some Restrictions
Long Beach, CA
Some Restrictions
Carson, CA
Some Restrictions
Santa Clarita, CA
Some Restrictions
Pasadena, CA
Some Restrictions