Key Facts
- Adopted code
- 2020 National Electrical Code (NFPA 70)
- Permit required
- Before any wiring, lighting, or power installation
- Fee schedule
- Set under § 5-7, referenced in § 5-82
- Contractor licensing
- State license or city Electrical Competency Card
- Enforcement
- Building official; misdemeanor under § 5-5/§ 1-9
Summary
Auburn enforces the 2020 edition of the National Electrical Code as its local electrical code, adopted by reference in Code of Ordinances § 5-65. Anyone wiring, altering or installing electrical service in the city must pull a permit and pay the fee schedule set out in § 5-7 before work begins, per § 5-82.
Sec. 5-65. - National Electrical Code—Adopted. The National Electrical Code, 2020 Edition, recommended by the National Fire Protection Association is hereby adopted and enacted as part of the law of the city and the same shall be known as the electrical code of the city and may be cited as such.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 90).
Full Breakdown
Section 5-65 of the Auburn Code adopts the 2020 National Electrical Code, recommended by the National Fire Protection Association, as the city's electrical code, with any code reference to 'NFPA 70' elsewhere in the city's building and fire code amendments read as pointing to this same currently adopted edition. Section 5-82 requires a permit and payment of fees before any building's electrical wiring, lighting, heating or power installation, or any alteration to existing wiring, may proceed, with the current fee table maintained in § 5-7 rather than fixed in the ordinance text itself.
Contractors doing electrical work in Auburn also fall under the licensing rules in § 5-3: anyone required to hold a state electrical license must show an active Alabama Electrical Contractors Board license before the city will issue a permit or business license, and electrical contractors who are not state-licensed must instead renew a City of Auburn Electrical Competency Card annually, a card that lapses if not renewed on time and must be replaced through the state board before any further city permit or business license is issued.
All electrical work performed under a permit must be supervised by a licensed master or journeyman electrician. Homeowners doing their own wiring and licensed contractors both go through the same building official permit and inspection process, and inspections check the work against the 2020 NEC as locally adopted, not an older or newer edition.
Violations & Fines
Performing electrical work without the required permit, or work that fails to meet the adopted 2020 NEC, violates Auburn Code § 5-5, a misdemeanor under § 1-9 punishable by a fine of up to $500 and/or up to six months in jail, with each day of continued noncompliance a separate offense. The building official can refuse a certificate of occupancy until wiring passes inspection.
Frequently Asked Questions
What electrical code does Auburn use?
Do I need a permit to rewire part of my house?
Can a homeowner without a state license do electrical work?
Sources & Official References
Other rules in Auburn
Compare Auburn to another location·View the Alabama building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.