Auburn, AL Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Adopted code
2020 National Electrical Code (NFPA 70)
Permit required
Before any wiring, lighting, or power installation
Fee schedule
Set under § 5-7, referenced in § 5-82
Contractor licensing
State license or city Electrical Competency Card
Enforcement
Building official; misdemeanor under § 5-5/§ 1-9

Summary

Auburn enforces the 2020 edition of the National Electrical Code as its local electrical code, adopted by reference in Code of Ordinances § 5-65. Anyone wiring, altering or installing electrical service in the city must pull a permit and pay the fee schedule set out in § 5-7 before work begins, per § 5-82.

Sec. 5-65. - National Electrical Code—Adopted. The National Electrical Code, 2020 Edition, recommended by the National Fire Protection Association is hereby adopted and enacted as part of the law of the city and the same shall be known as the electrical code of the city and may be cited as such.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 90).

Full Breakdown

Section 5-65 of the Auburn Code adopts the 2020 National Electrical Code, recommended by the National Fire Protection Association, as the city's electrical code, with any code reference to 'NFPA 70' elsewhere in the city's building and fire code amendments read as pointing to this same currently adopted edition. Section 5-82 requires a permit and payment of fees before any building's electrical wiring, lighting, heating or power installation, or any alteration to existing wiring, may proceed, with the current fee table maintained in § 5-7 rather than fixed in the ordinance text itself.

Contractors doing electrical work in Auburn also fall under the licensing rules in § 5-3: anyone required to hold a state electrical license must show an active Alabama Electrical Contractors Board license before the city will issue a permit or business license, and electrical contractors who are not state-licensed must instead renew a City of Auburn Electrical Competency Card annually, a card that lapses if not renewed on time and must be replaced through the state board before any further city permit or business license is issued.

All electrical work performed under a permit must be supervised by a licensed master or journeyman electrician. Homeowners doing their own wiring and licensed contractors both go through the same building official permit and inspection process, and inspections check the work against the 2020 NEC as locally adopted, not an older or newer edition.

Violations & Fines

Performing electrical work without the required permit, or work that fails to meet the adopted 2020 NEC, violates Auburn Code § 5-5, a misdemeanor under § 1-9 punishable by a fine of up to $500 and/or up to six months in jail, with each day of continued noncompliance a separate offense. The building official can refuse a certificate of occupancy until wiring passes inspection.

Frequently Asked Questions

What electrical code does Auburn use?
Auburn adopted the 2020 edition of the National Electrical Code by reference in Code of Ordinances § 5-65. Any reference elsewhere in the city's building or fire code amendments to 'NFPA 70' means this same 2020 edition, and all wiring inspections are measured against its requirements.
Do I need a permit to rewire part of my house?
Yes. Section 5-82 requires a permit and payment of the current fee, listed in § 5-7, before any wiring for electric lights, heat or power is installed or altered in a building. The work must also be supervised by a licensed master or journeyman electrician under § 5-3.
Can a homeowner without a state license do electrical work?
Anyone required to hold a state license for construction, plumbing or mechanical work must show an active state license before the city issues a permit. Electrical contractors without an Alabama Electrical Contractors Board license must instead renew a City of Auburn Electrical Competency Card every year under § 5-3.

Sources & Official References

Other rules in Auburn

All Auburn rules

Compare Auburn to another location·View the Alabama building safety overview

Get notified when Electrical Permits in Auburn, AL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.