Key Facts

Adopted code
National Electrical Code, state/local amendments
Permit trigger
Any new, altered, or replaced electrical system
Late-permit penalty
100% of usual permit fee, Sec. 14-56(u)(2)
Issuing authority
Building official, Sec. 14-54
Fee source
County schedule of fees and charges, Sec. 14-39

Summary

Effingham County adopts the National Electrical Code, with state and local amendments, to govern every electrical installation in the unincorporated county. Sec. 14-56 requires anyone who wants to erect, install, alter, repair, or replace an electrical system to first apply to the building official and obtain a permit before starting work, with permit and inspection fees set in the county's fee schedule.

These county ordinances apply to unincorporated areas of Effingham County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(c)Electrical code. The provisions of the National Electrical Code, with state amendments and local amendments, shall apply to the installation of electrical systems, including alterations, repairs, replacement, equipment, appliances, fixtures, fittings, and appurtenances thereto. ... ... Sec. 14-56. - Permits. (a)When required. Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert, or replace any electrical, gas, mechanical, or plumbing system, the installation of which is regulated by the technical codes adopted in section 14-36, or to cause any such work to do done, shall first make application to the building official and obtain the required permit for the work.

Full Breakdown

Sec. 14-53(c) of the building code applies the National Electrical Code, with state amendments and local amendments, to the installation of electrical systems in Effingham County, covering alterations, repairs, replacements, equipment, appliances, fixtures, fittings, and appurtenances. Sec. 14-56(a) then sets the permit trigger: any owner, authorized agent, or contractor who wants to erect, install, enlarge, alter, repair, remove, convert, or replace an electrical system regulated by the technical codes must first apply to the building official and obtain the permit before the work begins. The building official, established under Sec.

14-54, reviews plans, and under Sec. 14-57 the department performs an underground inspection after conduit or cable is installed and before backfill, a rough-in inspection after framing and fireblocking are in place but before wall or ceiling membranes go up, and a final inspection once fixtures are connected and the structure is ready for occupancy. No electrical connection may be energized until the building official releases the work in writing, and under Sec. 14-58 a certificate of occupancy cannot issue until the electrical system passes final inspection.

Permit and inspection fees are set in the county's schedule of fees and charges on file with the county clerk under Sec. 14-39. Doing electrical work before obtaining the required permit exposes the person to a penalty equal to 100 percent of the usual permit fee, on top of the permit fee itself, under Sec. 14-56(u)(2).

Violations & Fines

Starting electrical work before the building official issues the permit triggers a penalty of 100 percent of the usual permit fee, in addition to the fee itself, under Sec. 14-56(u)(2). The building official can also issue a stop-work order under Sec. 14-55(c) for work done contrary to the adopted electrical code or in a dangerous manner, and can revoke a permit under Sec. 14-55(d) for a misrepresented application or a code violation.

Frequently Asked Questions

Do I need a permit to rewire part of my house in Effingham County?
Yes. Sec. 14-56(a) requires a permit from the building official before any electrical installation, alteration, repair, or replacement covered by the adopted National Electrical Code, and Sec. 14-53(c) confirms that code applies with state and local amendments.
What happens if I do electrical work without a permit first?
Under Sec. 14-56(u)(2), you owe a penalty equal to 100 percent of the usual permit fee, on top of the fee itself, and the building official can issue a stop-work order under Sec. 14-55(c) until you come into compliance.
Who inspects electrical work in the county?
The building official's department, established under Sec. 14-54, performs the underground, rough-in, and final inspections listed in Sec. 14-57, and no certificate of occupancy issues under Sec. 14-58 until the electrical system passes final inspection.

Sources & Official References

Other rules in Effingham County

All Effingham County rules

Compare Effingham County to another location·View the Georgia building safety overview

Get notified when Electrical Permits in Effingham County, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.