Key Facts

Adopted code
NFPA 70 NEC, 2020 Edition
Citation
El Paso City Code § 18.16.020
Permit fee timing
Paid when permit is issued
Unpermitted commercial work penalty
300% of established fee
Unpermitted homeowner work penalty
200% of established fee
Meter disconnect proximity (<=800A)
Within 5 feet of meter

Summary

El Paso runs its electrical work under the 2020 NFPA 70 National Electrical Code, adopted wholesale by City Code § 18.16.020 with local amendments, and every electrical permit carries an established fee under § 18.02.106.15, paid when the permit is issued. Local changes cover items like outdoor lighting at dwelling entrances and meter-disconnect placement.

18.16.020 - Adoption. The book entitled "NFPA 70 National Electrical Code," 2020 Edition, a copy of which authenticated by the City Clerk is on file in the City Clerk's Office is adopted as the Electrical Code of the City, as fully as if copied at length in this chapter, but with the changes set forth in this chapter and Chapter 18.02, the Building and Administrative Code of the City of El Paso.

Full Breakdown

110 sets a five-foot proximity rule for load-break rated meter disconnects on services of 800 amps or less. 30 charge contractors 300% and homeowners 200% for unpermitted residential electrical work, in addition to possible prosecution. All of these sections were adopted or rewritten by Ord. No. 019528 on August 1, 2023.

Violations & Fines

Starting electrical work before the permit issues triggers a 300% fee penalty for commercial jobs and contractor-performed residential jobs, or 200% for homeowner-performed residential jobs, under §§ 18.02.106.28-.106.30, on top of any prosecution for violating Chapter 18.16 or the Building and Administrative Code.

Frequently Asked Questions

What electrical code does El Paso enforce?
City Code § 18.16.020 adopts the 2020 Edition of NFPA 70, the National Electrical Code, as El Paso's Electrical Code, modified by the local amendments in Chapter 18.16 and the administrative rules in Chapter 18.02.
Do I need a permit just to add an outlet?
Yes. Section 18.02.106.15 requires the established fee to be paid for every electrical permit at the time of issuance, and § 18.02.105.1 requires a permit application for any electrical work regulated by the technical codes.
Does El Paso require exterior lighting at garage entrances?
Yes. Section 18.16.040 amends NEC 210.70(A)(2)(b) to require a wall switch-controlled lighting outlet at dwelling, attached-garage and detached-garage entrances with grade-level access, counting a vehicle garage door as an entrance.
What if a contractor starts electrical work without a permit?
Section 18.02.106.29 requires the contractor to obtain the permit at 300% of the established fee, and payment of that penalty does not shield the contractor from separate prosecution for violating the Code or the technical codes.

Sources & Official References

Other rules in El Paso

All El Paso rules

Texas rules heatmap·Compare El Paso to another location·View the Texas building safety overview

Get notified when Electrical Permits in El Paso, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.