Georgetown County, SC Building Safety: Electrical Permits (2026)
Key Facts
- Adopted electrical code
- National Electric Code, 2020 Edition, with SC modifications
- Service disconnect location
- Outside the building at accessible location
- Certificate of compliance validity
- 90 days, one renewal permitted
- Connecting power without authorization
- Unlawful under Sec. 7-12(d)
- Penalty for violation
- Up to $500 fine or 30 days jail
Summary
Georgetown County has adopted the 2020 National Electric Code, with South Carolina modifications, as its electrical code. Sec. 7-12(d) makes it unlawful to connect any wiring, device or equipment to power without a construction power permit, certificate of occupancy, or certificate of compliance, and Sec. 7-3 relocates the required service disconnect outside the structure at ground level.
h.The National Electric Code, 2020 Edition, with SC modifications. ... ... Sec. 7-3. - Text changes. National Electric Code, Section 230.70(a) change to read: The service disconnecting means shall be installed at a readily accessible location outside of a building or structure. ... ... Sec. 7-12. - Inspections. ... (d)It shall be unlawful for any person to connect or reconnect any installation of electrical wiring, devices, appliances or equipment to a source of power supply without one (1) of the following permits or certificates:(1)Construction power permit which allows power to be connected to a temporary power pole for construction purposes.
Full Breakdown
Sec. 7-1(1)(h) enacts the National Electric Code, 2020 Edition, with South Carolina modifications, as county ordinance, part of a package of model codes updated roughly every three years under Sec. 7-1's introductory text. Sec. 7-3 amends NEC Section 230.70(a) for the county: the service disconnecting means must be installed at a readily accessible location outside of a building or structure, though an exception allows it inside a one-hour fire-rated enclosure with direct exterior access at ground level. Sec. 7-12(c) requires that electrical wiring not be covered or concealed until the building official has inspected and approved it.
Sec. 7-12(d) then bars connecting or reconnecting any electrical wiring, device, appliance or equipment to a power source without one of five specific authorizations: a construction power permit for a temporary power pole, a mobile home certificate of occupancy, a certificate of occupancy for the finished building, a certificate of compliance (valid ninety days, renewable once, after which power is disconnected if a final certificate of occupancy has not issued), or another certificate the applicable code requires. Because electrical work is also construction work under Sec.
7-10(a), a building permit covering the electrical scope is required before that work begins, layering the general building-permit requirement on top of the connection-authorization rule in Sec. 7-12(d).
Violations & Fines
Sec. 7-18 treats a violation of the electrical provisions the same as any Chapter 7 violation: a misdemeanor punishable by a fine not to exceed five hundred dollars or imprisonment of not more than thirty days, with each day of continued violation a separate offense. A certificate of compliance that expires without a final inspection results in disconnection of electrical power under Sec. 7-12(d)(4).
Frequently Asked Questions
Where must my main electrical disconnect be located in Georgetown County?
Can I turn on power to my construction site before the building is finished?
How long is a certificate of compliance good for?
What electrical code applies to new construction in unincorporated Georgetown County?
Sources & Official References
Other rules in Georgetown County