Goodyear, AZ Building Safety: Electrical Permits (2026)
Key Facts
- Adopted code
- 2023 NFPA 70 NEC
- Enforcing office
- Goodyear Building Official
- Ordinary appeal deadline
- 20 days
- Imminent-danger appeal deadline
- 3 business days
- Penalty
- $50-$2,500 individual, up to $20,000 enterprise
- Board of Appeals
- 5 members, 2 alternates
Summary
Goodyear requires all electrical construction and installation to comply with the 2023 NFPA 70 National Electrical Code, which the Mayor and Council adopted by reference along with its Annexes C and D. The city's Building Official administers permits under the Building Code's incorporated procedures, and appeals go to a five-member Board of Appeals.
(G) Adoption of NFPA 70 National Electrical Code. That certain document known as the 2023 NFPA 70 National Electrical Code, including ANNEXES C and D as published by the National Fire Protection Association is hereby referred to, adopted and made a part hereof as if fully and completely set forth herein. (1) The 2023 NFPA 70 National Electrical Code as adopted by the Mayor and Council of the City of Goodyear, is hereby amended as follows...
Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 26-1648, passed April 27, 2026).
Full Breakdown
The City of Goodyear adopts the 2023 edition of NFPA 70, the National Electrical Code, under Goodyear City Code § 9-1-1(G), and amends it so that the International Building Code's administrative provisions, Sections 103 through 116, govern permitting for electrical work (NEC § 90.1.1). Electrical systems for commercial buildings and most structures other than one- and two-family dwellings fall under this adopted NEC, per § 9-1-1's amendment to IBC § 101.4.9, while detached one- and two-family dwellings instead follow the International Residential Code. Before a project is finished, the Building Official may authorize temporary electrical connections under § 9-1-1's amendment to IBC § 112.2, but the work must still meet NEC temporary lighting, heat and power requirements.
Disputes over a Building Official's application of the electrical code go to the Board of Appeals created under IBC § 113.1, a five-member panel that must include a design professional or contractor with electrical engineering experience under § 113.2.1(4). Ordinary appeals of permit or violation decisions must be filed in writing within 20 days of the notice or determination; appeals involving imminent danger from unsafe electrical equipment must be filed within three business days (§ 113.6). A decision can be reversed only by a concurring vote of at least three of the five board members hearing the case (§ 113.3).
The Board holds public hearings, and an appellant is entitled to have all five members present, with the right to demand a postponement if fewer attend (§ 113.4.1).
Violations & Fines
Working without a required electrical permit or ignoring a Building Official's correction notice is enforced under Goodyear's general building-code penalty at § 9-5-1: a fine of $50 to $2,500 for an individual, or up to $20,000 for a business enterprise, plus up to six months in jail. Each ten consecutive days a violation continues counts as a separate offense, and the city may also seek injunctive relief or civil code enforcement instead of criminal prosecution.
Frequently Asked Questions
What electrical code does Goodyear enforce?
How do I appeal an electrical permit denial in Goodyear?
Can I get temporary power before my electrical inspection is final?
Sources & Official References
Other rules in Goodyear
Compare Goodyear to another location·View the Arizona building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Electrical Permits in Nearby Cities
How other cities in Maricopa County handle electrical permits.