Berkeley County, SC Building Safety: Electrical Permits (2026)
Key Facts
- NEC edition adopted
- 2020 Edition (§ 11-31)
- Permit fee up to 200 amps
- $45.00 flat (§ 11-86)
- Fee over 200 amps
- $45.00 + $0.15/amp above 200
- Service-interruption inspection fee
- $25.00 (§ 11-86)
- Admin fee per permit
- $25.00 (§ 11-69)
- Penalty
- up to $200 fine / 30 days jail (§ 11-103)
Summary
Berkeley County enforces the 2020 National Electrical Code by reference under Sec. 11-31 and charges a flat $45.00 electrical permit fee for service up to 200 amps under Sec. 11-86, plus $0.15 per amp above 200 and a $25.00 safety-inspection fee whenever service has been interrupted.
2020 Edition: National Electric Code ... Sec. 11-86. - Electrical permit fees. The fees for electrical permits up to 200 amps shall be $45.00. The fees for electrical permits over 200 amps shall be $45.00 and $0.15 for each additional amp above 200 amps. The fee for a safety inspection where electrical service has been interrupted shall be $25.00.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 37).
Full Breakdown
Sec. 11-31 adopts the National Electric Code, 2020 Edition, by reference alongside the 2021-edition International Building, Residential, Mechanical, Plumbing, Fire, Fuel Gas, Existing Building, and Swimming Pool and Spa Codes, and states that amendments or subsequent editions become effective in the county on the effective date specified by the state. Sec. 15 for each additional amp above 200 amps. 00 fee for a safety inspection where electrical service has been interrupted, covering the common case of a home whose power was cut and needs re-energizing.
Like every other permit in chapter 11, an electrical permit cannot be pulled without the accompanying documents required by Sec. 11-61, and no electrical work covered by the adopted codes may commence until the permitting department issues the permit under Sec. 11-64, with fees doubling under Sec. 11-65 if the work starts first. 00 administrative fee under Sec. 11-69 applies on top of the amperage-based fee for every permit application. Responsibility for enforcing the adopted electrical code rests with the county official whose duties correspond to those named in the code itself, per Sec. 11-32, and disputes over the building official's application of the code go to the Construction Board of Adjustments and Appeals under Sec. 11-34.
Violations & Fines
Performing electrical work without the required permit doubles the $45.00-plus fee under Sec. 11-65 and exposes the owner or contractor to the general chapter 11 misdemeanor penalty in Sec. 11-103: a fine up to $200.00 and/or up to 30 days in jail, with each day of continued noncompliance a separate offense. The chief building official can also suspend or revoke a wrongly issued permit under Sec. 11-66.
Frequently Asked Questions
What electrical code does Berkeley County actually enforce?
How much is a basic electrical permit?
My power was shut off and I need it reconnected. Is there a fee?
What if an electrician starts work before pulling the permit?
Sources & Official References
Other rules in Berkeley County
Compare Berkeley County to another location·View the South Carolina building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.