Berkeley County, SC Building Safety: Plumbing Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Fixture fee
$3.00 per fixture
Water heater fee
$5.00 each
DWV system fee
$15.00 new/repaired/altered
Sewer connection fee
$15.00 per connection
Adopted code
2021 International Plumbing Code
Max fine
$200.00 under Sec. 1-8(c)

Summary

Berkeley County requires a plumbing permit under Berkeley County Code of Ordinances Sec. 11-88 for any fixture, water heater, drain-waste-vent system, water-piping work, or sewer connection in the unincorporated county. Fees are itemized per item rather than flat-rated, and the county enforces the 2021 International Plumbing Code it adopted by reference in Sec. 11-31, administered through the building and codes department.

These county ordinances apply to unincorporated areas of Berkeley County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

The following fees shall be charged when provided: For each plumbing fixture, (including water and drainage) - $3.00 For each water heater and/or appurtenances - $5.00 For each drain, waste and vent system, new, repaired or altered - $15.00 For installation, alteration, or repair of water piping - $15.00 For each sewer to public, private, or individual sewage disposal system - $15.00

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 37).

Full Breakdown

Sec. 11-31 of the Berkeley County Code of Ordinances adopts, as mandated by the South Carolina Department of Labor, Licensing, and Regulation, the 2021 International Plumbing Code, including Chapter One, as an ordinance of the county for all unincorporated territory. Sec. 00 for each sewer connection to a public, private, or individual sewage disposal system. A multipermit may be issued for buildings needing several separate plumbing permits, such as apartment buildings, with administrative fees charged per unit. The chief building official may instead use the signed contract price of a job to set the fee if the itemized schedule undervalues the work.

Sec. 11-32 makes the county's designated building official the responsible official for enforcing the adopted plumbing code. Before any certificate of occupancy is issued, Sec. 11-61 requires the permitting department to have received water and sewer tap receipts and, where applicable, DHEC septic approval, plus verification that all fees are paid.

Violations & Fines

Plumbing work performed without the required permit, or in violation of the adopted International Plumbing Code, is enforced as a building-code violation under Sec. 1-8(c) of the county code, which caps fines for violations of adopted technical codes at $200.00 and imprisonment at 30 days, with each day of continuing violation a separate offense. The chief building official may also order utility disconnection for unpermitted or hazardous work under Sec. 11-100.

Frequently Asked Questions

Does Berkeley County require a permit for plumbing repairs?
Yes. Sec. 11-88 charges fees for any plumbing fixture, water heater, drain-waste-vent work, water piping installation or repair, and sewer connections in the unincorporated county. The chief building official can also base the fee on the signed contract price rather than the itemized schedule when a job's scope is underestimated.
What plumbing code applies in unincorporated Berkeley County?
The county adopted the 2021 International Plumbing Code, including Chapter One, under Sec. 11-31, as mandated by the South Carolina Department of Labor, Licensing, and Regulation. Amendments take effect on the date the state specifies, and the county's building official enforces the code under Sec. 11-32.
What happens if I finish plumbing work without a final inspection?
A certificate of occupancy will not be issued until the permitting department confirms water and sewer tap receipts, applicable DHEC septic approval, and full payment of fees under Sec. 11-61, so unpermitted plumbing can block occupancy of the structure.

Sources & Official References

Other rules in Berkeley County

All Berkeley County rules

Compare Berkeley County to another location·View the South Carolina building safety overview

Get notified when Plumbing Permits in Berkeley County, SC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.