Adopted code
2020 National Electrical Code (OUBCC-modified)
Permit required
Separate permit per structure, § 9-153
Who can obtain
City-licensed electrical contractors only
Permit expiration
Void after 180 days unstarted
Enforcing office
Chief Building Official, Midwest City

Summary

Midwest City has adopted the 2020 National Electrical Code as modified by the state and requires a separate permit for each structure before any electrical system is installed, altered, repaired or replaced.

No electrical system regulated by this Code shall be installed, altered, repaired, replaced or remodeled unless a separate electrical permit for each structure has first been obtained from the city. Except as otherwise provided, no permit shall be issued to anyone other than a licensed electrical contractor.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 21).

Full Breakdown

City Code § 9-135 adopts the 2020 National Electrical Code, as modified by the Oklahoma Uniform Building Code Commission, as the governing standard citywide. Under § 9-153, no electrical system can be installed, altered, repaired, replaced or remodeled without a separate permit for each structure, and only a contractor licensed by both the State of Oklahoma and the city can pull one (§ 9-136). Permits lapse if work has not started within 180 days (§ 9-150). This applies only inside Midwest City's corporate limits, not Tinker Air Force Base, Oklahoma City, Del City or Choctaw, each of which enforces its own electrical code.

Violations & Fines

Working without a permit is a code violation; the city can order stop-work, deny or cancel permits, and require correction before power is reconnected (§§ 9-150–9-155).

Frequently Asked Questions

Do I need a permit to do my own home electrical work in Midwest City?
Section 9-153 requires a permit for any electrical installation, alteration or repair, and permits go only to licensed contractors; the code does not carve out a homeowner exemption like it does for roofing.
What electrical code does Midwest City follow?
The city has adopted the 2020 National Electrical Code as modified by the Oklahoma Uniform Building Code Commission, per § 9-135 and § 9-5(h) of the city code.
Does this apply on Tinker Air Force Base?
No. Tinker AFB is federal property and follows federal, not Midwest City, electrical code and permitting requirements.

Sources & Official References

Other rules in Midwest City

All Midwest City rules

Compare Midwest City to another location·View the Oklahoma building safety overview

Get notified when Electrical Permits in Midwest City, OK changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Electrical Permits in Nearby Cities

How other cities in this county handle electrical permits.

Edmond, OK
Some Restrictions
Oklahoma City, OK
Some Restrictions