Milwaukee, WI Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit required
Before any electrical work begins
State code adopted
Wis. Admin. Code SPS 305, 316, 318
Minor-fixture exemption
Switch/receptacle/luminaire swap rated ≤20 amps
Permit validity
Lapses after 6 months unstarted or stalled
Who can pull it
State-licensed electrical contractor only

Summary

Milwaukee requires a permit before any electrical equipment is installed, altered, renewed, replaced or connected, and adopts the state electrical code (SPS 316) as part of its own code.

222-13. Permits. 1. PERMIT REQUIRED. Except as regulated in s. 222-1-2 or exempted in s. 200-24-1.5, no electrical equipment shall be installed, altered, renewed, replaced or connected without first procuring a permit.

Full Breakdown

Under Chapter 222 of the Building and Zoning Code, Milwaukee adopts Wisconsin Administrative Code chs. SPS 305, SPS 316 and SPS 318 as part of its own electrical regulations, and separately requires a permit before any electrical equipment is installed, altered, renewed, replaced or connected: with narrow exceptions for repairing plug-connected appliances and swapping a switch, receptacle or luminaire rated 20 amps or less. Only a state-licensed electrical contractor, or a person exempt under Wis. Stat. § 101.862(4), can perform licensed work, and the application must be signed by the applicant's supervising master electrician. A permit lapses if work isn't started within 6 months or is stalled for 6 months.

Violations & Fines

Working without a permit lets the commissioner order immediate disconnection of the equipment and halt the work; unpermitted or non-compliant installations are grounds for withholding future permits.

Frequently Asked Questions

Do I need a permit for minor electrical repairs in Milwaukee?
Minor work is exempt: repairing a plug-connected appliance or swapping an existing switch, receptacle or luminaire rated 20 amps or less does not require a permit or license, per Code § 222-1-2.
How long does a Milwaukee electrical permit stay valid?
Six months. The permit lapses and becomes void if the work isn't started within 6 months of issuance, or if permitted work stops for more than 6 months, per Code § 222-13-8.
Who is allowed to pull an electrical permit in Milwaukee?
A state-licensed electrical contractor, with the application signed by the applicant's supervising master electrician, under Code § 222-13-1-a; separate permit types exist for low-voltage and state-exempt work.

Sources & Official References

Other rules in Milwaukee

All Milwaukee rules

Compare Milwaukee to another location·View the Wisconsin building safety overview

Get notified when Electrical Permits in Milwaukee, WI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Electrical Permits in Nearby Cities

How other cities in Milwaukee County handle electrical permits.

Wauwatosa, WI
Some Restrictions
West Allis, WI
Some Restrictions