Nashua, NH Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Adopted code
NFPA 70 (National Electrical Code)
Application/review fee
$50, nonrefundable
Unpermitted work surcharge
100% of fee, up to $275
Reinspection fee
$75
Administering department
Department of Building Safety

Summary

Nashua adopts NFPA 70, the National Electrical Code, and requires a paid permit with a $50 review fee before any electrical work begins.

A certain document and referenced code on file in the Department of Building Safety of the City of Nashua, New Hampshire, being marked and designated as "NFPA 70, The National Electrical Code," adopted as per the New Hampshire State Building Code per RSA 155-A ... are hereby adopted as the Electrical Code of the City of Nashua ... Nonrefundable application processing and review fee: $50.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4805762; v29 updated 2026-02-10; through 02-10-2026).

Full Breakdown

Chapter 105, Article V adopts NFPA 70 (the National Electrical Code) as the Electrical Code of the City of Nashua, administered by the Department of Building Safety, with one local amendment deleting Section 518-4(b) on non-rated construction. Under the citywide fee schedule, an electrical permit application requires a nonrefundable $50 processing and review fee, and no permit is valid until fees are paid. Residential work adds usage-based charges (for example $0.08 per square foot for new wiring, $55 for a service change), and starting work before a permit issues triggers a 100% surcharge up to $275.

Violations & Fines

Working without a paid, issued permit triggers a surcharge of 100% of the applicable fee, capped at $275 for residential electrical work; reinspection after a failed inspection costs an added $75.

Frequently Asked Questions

What electrical code does Nashua use?
NFPA 70, the National Electrical Code, adopted under the New Hampshire State Building Code (RSA 155-A), with one local amendment deleting Section 518-4(b).
Do I need a permit before starting electrical work in Nashua?
Yes. A permit is not valid until the prescribed fees are paid, and starting work first adds a surcharge up to 100% of the fee, capped at $275 for residential jobs.

Sources & Official References

Other rules in Nashua

All Nashua rules

Compare Nashua to another location·View the New Hampshire building safety overview

Get notified when Electrical Permits in Nashua, NH changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.