Nashville, TN Building Safety: Electrical Permits (2026)
Key Facts
- Adopted code
- 2023 National Electrical Code
- Permit issued by
- Dept. of Codes Administration
- No-permit penalty
- Permit fee tripled
- Homeowner permits
- Allowed on own principal home
- Governing chapter
- Metro Code Title 16, Ch. 16.20
Summary
Metro Nashville requires an electrical permit from the Department of Codes Administration before installing, connecting, or altering any electrical system, wired under the 2023 National Electrical Code adopted by Metropolitan Code of Laws § 16.20.140.
The 2023 Edition of the National Electrical Code, Article 90 through Chapter 9 inclusive are adopted and incorporated into this chapter as the technical section of the electrical code of the metropolitan government, by reference, as fully as though copied into this chapter. ... It shall be the duty of every person legally entitled to apply for and receive an electrical permit, to make application for and to obtain the required electrical permit from the department of codes administration prior to the installation of any electrical system or part thereof.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 53 | Charter: Republication 9).
Full Breakdown
Metro adopts the 2023 National Electrical Code (Article 90 through Chapter 9) and the 2024 International Residential Code electrical chapters as its technical electrical standard. Section 16.20.160 requires a permit before any electrical installation, connection to a power source, or new device or fixture is installed anywhere in Metro Nashville and Davidson County. Minor repairs and maintenance that add no new conductors are exempt, as is limited low-voltage wiring in one- and two-family homes. Only registered metropolitan electrical contractors, or homeowners permitted to work on their own principal residence, may pull the permit. Work performed before a permit issues triples the required fee.
Violations & Fines
Starting electrical work before the permit issues triples the fee under § 16.20.250(B); unregistered contractors who pull permits violate the registration requirement in § 16.20.190, risking permit revocation and stop-work orders.
Frequently Asked Questions
Do I need a permit for minor electrical repairs in Nashville?
What happens if I start electrical work without a permit?
Can a homeowner get their own electrical permit in Nashville?
Sources & Official References
Other rules in Nashville
Compare Nashville to another location·View the Tennessee building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.