Skip to main content
CityRuleLookup

New Braunfels, TX Building Safety: Electrical Permits (2026)

Few Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Code adopted
2020 NEC, all annexes
Permit required
For each electrical job
Contractor liability insurance
$300,000 minimum
Registration renewal
Annually, before license expires

Summary

New Braunfels runs the 2020 National Electrical Code and requires a city permit plus a registered, insured electrical contractor for any electrical work.

The building official shall cause to be issued for each job requiring any type of electrical work a permit, shall see that the fees (see section 14-66) set out in this article are properly paid, and that all work done under such permits are accomplished in accordance with this article under the direct supervision of persons registered under the provisions of this article.

(c) Stop work orders. Upon notice from the building official that electrical work on any building or structure is being done contrary to the provisions of this article or in a dangerous or unsafe manner, such work shall be immediately stopped. Such notice shall be in writing and shall be given to the owner of the property, or to his agent, or to the person doing the work, and shall state the conditions under which work may be resumed. Where an emergency exists, the stop work order shall be given verbally with written notice following within two working days.

(d) Revocation of permits. The building official may revoke a permit or approval issued under the provisions of this article if there has been any false statement, misunderstanding or misrepresentation as to a material fact in the application or plans on which the permit or approval was based.

(e) Electrically unsafe buildings. All buildings or structures which in the opinion of the electrical inspector are electrically unsafe so as to create a hazard to life or constitute a fire hazard or

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 36).

Full Breakdown

The city adopted the 2020 National Electrical Code by reference as its electrical code under Sec. 14-30. The building official must issue a permit for each job requiring electrical work, collect the required fees, and confirm the work is done under the direct supervision of a contractor registered under the article (Sec. 14-32(b)). Electrical contractors must hold a current city registration backed by $300,000 in liability insurance and must carry proof of that registration on the job (Sec. 14-45). Utilities are barred from connecting permanent service until the city has issued a certificate of occupancy or release (Sec. 14-31(b)).

Violations & Fines

Unpermitted or unregistered electrical work can draw a stop-work order from the building official, and utilities may be blocked from connecting service; a registration can be revoked for false statements on the application.

Frequently Asked Questions

Can I do my own electrical work in New Braunfels?
The code allows a homeowner exception under Sec. 14-62; otherwise work must be done by a contractor registered with the city under Sec. 14-45.
When can a utility turn on power to a new building?
Only after the city issues a certificate of occupancy or release, per Sec. 14-31(b); temporary service for construction can run up to 180 days.

Sources & Official References

Other rules in New Braunfels

All New Braunfels rules

Texas rules heatmap·Compare New Braunfels to another location·View the Texas building safety overview

Get notified when Electrical Permits in New Braunfels, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.