Key Facts

Permit trigger
Installation, extension, or replacement of electrical systems (§ 32-210(a)(2))
Issuing official
Township building official
Code enforced
State construction code (§ 6-19)
Fees
Set by Township Board resolution (§ 6-20)
Appeal body
Construction Board of Appeals, filing within 30 days
Penalty
Misdemeanor: fine up to $500.00, up to 90 days

Summary

In Royal Oak Township, Michigan, a building permit or other appropriate permit is required before the installation, extension, or replacement of plumbing, electrical, drainage, or similar utility systems. The township building official enforces the state construction code and reviews each application under § 32-210.

(a) Required. ... A building permit or other appropriate permit shall be required as follows: ... (2) Prior to the installation, extension, or replacement of plumbing, electrical, drainage, or similar utility systems. ... (b) Application requirements. No permit shall be issued for construction, alteration, or remodeling of any building or structure until an application has been submitted demonstrating that the proposed improvements comply with the provisions of this chapter and the state construction code.

Full Breakdown

The Charter Township of Royal Oak does not write a separate electrical permit section in the portion of the code that governs permits. Instead, § 32-210(a)(2) requires a building permit or other appropriate permit prior to the installation, extension, or replacement of plumbing, electrical, drainage, or similar utility systems. Electrical work is therefore permitted through the same building official process as other construction.

Under § 32-210(b), no permit is issued for construction, alteration, or remodeling of any building or structure until an application shows that the proposed improvements comply with the zoning chapter and the state construction code. Applications are filed with the building official on forms that official prescribes, and the plans must be detailed enough for the official to decide whether the work conforms. Among the items every application must supply when no site plan is required is all information required by the state construction code.

Section 6-19 designates the building official as the Township's enforcing agency for the state construction code under Section 8b(6) of Public Act No. 230 of 1972, covering the whole corporate limits. Section 6-20 sets permit fees for enforcing that code by resolution of the Township Board, and § 32-231 requires fees to be collected in advance, with permits suspended on deficient payment. Under § 32-210(c), a permit is issued only if the building official finds conformity with the zoning chapter, the state construction code act, all township adopted codes, and other applicable laws and ordinances. On completion, the holder gives notice for final inspection under § 32-210(e).

Temporary uses also touch electrical work: under § 32-623, a special event or other temporary use granted by the building official carries the condition that electrical and utility connections are approved by the building official.

Disputes go to the Construction Board of Appeals under § 6-21(g), which hears matters arising from building, mechanical, refrigeration, electrical, plumbing, fire, boiler or other property maintenance codes. Appeals are filed within 30 days of the decision.

Violations & Fines

Work done without the required permit violates the zoning chapter, and § 32-262 makes any violation a misdemeanor punishable by a fine not exceeding $500.00 or imprisonment not exceeding 90 days, or both, for each offense. Each day a violation continues is a separate offense, and contractors and others who participate in the violation can each be charged. Prosecution and administrative costs are assessed against the violator.

Frequently Asked Questions

Do I need a permit to replace electrical wiring in Royal Oak Township?
Yes. Section 32-210(a)(2) requires a building permit or other appropriate permit prior to the installation, extension, or replacement of plumbing, electrical, drainage, or similar utility systems. The application is filed with the building official on forms that official prescribes, with plans detailed enough to show conformity with the state construction code.
Who enforces electrical work rules in the Charter Township of Royal Oak?
The building official. Section 6-19 designates the building official as the enforcing agency for the state construction code, under Section 8b(6) of Public Act No. 230 of 1972, and the Township takes responsibility for administration and enforcement throughout its corporate limits.
How much does an electrical permit cost?
The code prints no dollar amount. Section 6-20 provides that permit fees for enforcement of the state construction code are as currently established or as adopted by resolution of the Township Board from time to time. Section 32-231 requires fees to be collected in advance of reviews, inspections, or issuance of permits.
Where do I appeal an electrical permit decision?
To the Construction Board of Appeals, which under § 6-21(g) hears matters from building, mechanical, refrigeration, electrical, plumbing, fire, boiler or other property maintenance codes. File a notice of appeal within 30 days of the decision. The Board decides within 30 days of a written request unless you agree to a later date.
Does a temporary event in the Township need electrical approval?
Yes. Under § 32-623, the building official can grant temporary use of land and structures for special events and other temporary uses, subject to conditions that include electrical and utility connections being approved by the building official. The applicant must also specify the duration of the temporary use.

Sources & Official References

Other rules in Royal Oak Township

All Royal Oak Township rules

Compare Royal Oak Township to another location·View the Michigan building safety overview

Get notified when Electrical Permits in Royal Oak Township, MI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.