San Jacinto, CA Building Safety: Electrical Permits (2026)
Key Facts
- Adopted code
- California Electrical Code, 2025 Edition, including Article 89
- Local name
- Electrical Code of the City of San Jacinto
- Adopting section
- Municipal Code § 15.04.080
- Illuminated address circuit
- One hundred ten volt with photocell switching
- Permit fees
- Set by City Council resolution (§ 15.08.020)
- Stop-work authority
- Building Official (§ 15.04.115)
Summary
The City of San Jacinto, California adopts the California Electrical Code, 2025 Edition, including Article 89, as the Electrical Code of the City of San Jacinto under Municipal Code § 15.04.080. Section 15.04.090 adds a local rule for new homes: an illuminated address on a one hundred ten volt circuit with photocell switching.
The California Electrical Code, 2025 Edition, including Article 89 and all appendices, tables, and indices thereto (copies of which are on file in the Office of the City Clerk), is adopted as the "Electrical Code of the City of San Jacinto."
Full Breakdown
Section 15.04.080 of the San Jacinto Municipal Code adopts the California Electrical Code, 2025 Edition, including Article 89 and all appendices, tables and indices, as the Electrical Code of the City of San Jacinto. Copies are on file in the Office of the City Clerk. The section heading says Modifications, but the text prints no local amendments, so the adopted state text governs electrical work as written.
The city adds one electrical specification of its own. Under § 15.04.090(B), all new single-family dwellings and duplexes with garages carry an illuminated address attached to the left side of the front garage wall facing the street, sixty inches above the driveway surface. The illumination is one hundred ten volt with photocell switching, and the address numbers are one inch by four inches.
Permit procedure comes from Chapter 15.08. Section 15.08.010 requires a written application to the building inspector with plans, and fees are paid before the permit issues. Section 15.08.015 requires electronic submittal in a format the Building Official approves, with the same force as paper plans. Section 15.08.020 sets fees for permits, plan review, inspections and re-inspections by City Council resolution, and § 15.04.020 provides that a permit is not valid until the prescribed fees are paid, with plan review fees collected under the City's Master Fee Schedule. Permits for work other than single-family dwellings and their accessory structures issue only to a state-licensed contractor who holds a valid City of San Jacinto business license, while owner-builder permits are limited to single-family dwellings (Group R-3) and their accessory structures (§ 15.08.130).
Small residential rooftop solar systems eligible for expedited review under § 17.430.330 receive a building permit or other nondiscretionary permit once staff deem the application complete, and only one inspection is required.
Violations & Fines
Violating Chapter 15.04, which includes the adopted Electrical Code, is a misdemeanor punishable by fine, imprisonment or both, and each day is a separate offense (§ 15.04.120). A permit issued contrary to the chapter is void (§ 15.04.110). The Building Official issues stop-work orders where construction occurs without a permit, and work cannot resume until the violation is corrected, fees are paid and the order is rescinded (§ 15.04.115).
Frequently Asked Questions
Which electrical code applies in the City of San Jacinto?
What electrical requirement applies to a new home's address?
Can a homeowner pull an electrical permit?
What happens to work started without a permit?
Sources & Official References
Other rules in San Jacinto
California rules heatmap·Compare San Jacinto to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Electrical Permits in Nearby Cities
How other cities in Riverside County handle electrical permits.