Key Facts

Minimum permit fee
$50 per permit
Late-start penalty
$250 administrative fee per unit
Governing code
Virginia Uniform Statewide Building Code
Enforcement
Permits and Inspections Division
Temporary service fee
$50 flat fee

Summary

Virginia Beach requires an electrical permit for wiring work under the Uniform Statewide Building Code, with a minimum $50 fee per permit through the Permits and Inspections Division.

(a)The fee for a permit for electrical work, as required by the building code, shall be as specified in this section.(b)There shall be charged a minimum fee of fifty dollars ($50.00) for each permit issued.(c)For a permit issued for a temporary service, such as a trailer, house meter or meter loop added to an existing service, the fee shall be fifty dollars ($50.00).(d)For a permit for any special condition, such as and including temporary electrical release for construction purposes, buildings moved, swimming pools, carnivals, services relocated but not increased and the like, the fee shall be a minimum of seventy-five dollars ($75.00). The fee for a permit for prefabricated buildings for out-of-city use shall be fifty dollars ($50.00).(e)For a permit issued for original construction, the following fees include all equipment outlets only if specifically listed on the application and installed by the permit holder before the final inspection, such fees being based on the maximum current carrying capacity of each set or subset of service conductors installed, to the nearest fifty (50) amperes:(1)Single-phase: Fifty dollars ($50.00) plus twenty dollars ($20.00) for each additional fifty (50) amperes.(2)Three-phase: Eighty dollars ($80.00) plus twenty dollars ($20.00) for each additional fifty (50) amperes.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 170 Update 1).

Full Breakdown

Virginia Beach incorporates the Virginia Uniform Statewide Building Code, which in turn adopts the National Electrical Code, into its own code at City Code § 8-26. City Code § 8-34 then sets the city's own electrical permit fee schedule: a $50 minimum fee per permit, $50 for temporary services, $75 for special conditions like pool or carnival wiring, and tiered fees by service amperage for new construction. Anyone who starts electrical work before the permit is issued and paid for owes an added $250 administrative fee per unit, on top of any court penalties. The Permits and Inspections Division issues and enforces these permits.

Violations & Fines

Starting electrical work without a paid permit adds a $250 administrative fee per unit on top of the permit fee, and the city attorney can pursue court penalties under the Uniform Statewide Building Code.

Frequently Asked Questions

Does Virginia Beach require a permit for electrical work?
Yes. City Code § 8-34 sets electrical permit fees under the Uniform Statewide Building Code, with a $50 minimum fee per permit issued by the Permits and Inspections Division.
What happens if I start electrical work before getting a permit?
The city adds a $250 administrative fee per unit on top of the normal permit fee, and violators can still face court penalties under the building code.

Sources & Official References

Other rules in Virginia Beach

All Virginia Beach rules

Compare Virginia Beach to another location·View the Virginia building safety overview

Get notified when Electrical Permits in Virginia Beach, VA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.