Austin, TX Building Safety: Building Inspections (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Record card
Must post before work begins
Inspection request notice
Up to 48 hours advance required
Erosion/tree inspection window
5 days or owner may proceed
Reinspection fee trigger
Site or plans not ready
Free reinspection
First-inspection technical code failures only

Summary

Austin requires every permit holder to post an inspection record card on site before work begins under City Code Sec. 25-1-287. Inspectors log each visit on the card, and the Watershed Protection and Development Review Department's central dispatcher schedules inspections on request under Sec. 25-1-286. If a permittee isn't ready when the inspector arrives, Sec. 25-1-289 lets the director charge a reinspection fee.

§ 25-1-287 - INSPECTION RECORD CARD. (A)A permittee may not begin work under a permit until an inspection record card is posted on the site.(B)The permittee shall post the card in a readily accessible location.(C)The inspector shall note each inspection on the record card.(D)The permittee shall post the record card until the accountable official finds that the permittee meets all City requirements.

§ 25-1-289 - REINSPECTION FEE. (A)Except as provided in Subsection (B), the director may charge a reinspection fee if at the time that an inspector attempts to conduct an inspection, the permittee:(1)has not finished the work to be inspected;(2)has not finished corrections previously required by an inspector;(3)has not posted the record inspection card;(4)does not make approved plans readily available to the inspector; or(5)does not provide access to the work on the scheduled inspection date.(B)Work that was rejected at the first inspection for failure to comply with a technical code may be reinspected without payment of a reinspection fee.(C)If a reinspection fee is due, additional inspections may not be performed until the reinspection fee is paid.

Full Breakdown

Before any construction authorized by a City of Austin development permit begins, the permittee must post an inspection record card in a readily accessible location on the site (Sec. 25-1-287(A)-(B)); the field inspector notes every inspection directly on that card, and the card must stay posted until the accountable official confirms the permittee has met all City requirements (Sec. 25-1-287(C)-(D)). Getting an inspector to the site starts with the City's central dispatcher, which coordinates contact between the permittee and the inspector (Sec. 25-1-286(A)-(B)); the accountable official may require that inspection requests be submitted at least 48 hours before the desired inspection date and may set the manner of the request (Sec.

25-1-286(C)). For erosion, sedimentation control, and tree protection measures specifically, Sec. 25-1-288 requires the owner to request an inspection after the controls are installed, and if the accountable official in the Watershed Protection and Development Review Department fails to inspect within five days of the request, the owner may proceed with construction without waiting further (Sec. 25-1-288(G)). If the inspector shows up and the permittee hasn't finished the work, hasn't completed prior corrections, hasn't posted the record card, hasn't made approved plans available, or won't provide site access, the director may bill a reinspection fee (Sec.

25-1-289(A)); work rejected at a first inspection purely for a technical-code violation gets one free reinspection (Sec. 25-1-289(B)). Once a reinspection fee is owed, the City will not perform additional inspections on the permit until it's paid (Sec. 25-1-289(C)).

Violations & Fines

Skipping the posted record card or dodging an inspection request doesn't produce a criminal citation by itself, but it stalls the permit: the accountable official won't sign off on work that hasn't passed inspection, occupancy or final acceptance can't be certified, and Sec. 25-1-289(C) blocks any further inspection until an outstanding reinspection fee is paid, which can delay a certificate of occupancy indefinitely.

Frequently Asked Questions

Do I have to post anything on site before construction starts in Austin?
Yes. Under City Code Sec. 25-1-287, a permittee may not begin work under a permit until an inspection record card is posted in a readily accessible location, and it must stay posted until the accountable official confirms all City requirements are met.
How do I schedule a building inspection with the City of Austin?
Contact the City's central dispatcher, which coordinates inspector visits under Sec. 25-1-286. The accountable official can require the request be made at least 48 hours before the desired inspection date and can dictate how the request is submitted.
What happens if I'm not ready when the Austin inspector arrives?
The director may charge a reinspection fee under Sec. 25-1-289(A) if the work isn't finished, prior corrections aren't done, the record card isn't posted, plans aren't available, or the inspector can't access the site. No further inspections happen until that fee is paid.
Is there ever a free do-over inspection in Austin?
Yes. Sec. 25-1-289(B) waives the reinspection fee if the work was rejected at the very first inspection solely for failing to comply with a technical code.

Sources & Official References

Other rules in Austin

All Austin rules

Texas rules heatmap·Compare Austin to another location·View the Texas building safety overview

Get notified when Building Inspections in Austin, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.