Bellevue, WA Building Safety: Building Inspections (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Inspecting authority
Building official
Required inspection types
14, BCC 23.05.130(C)
Reinspection fee
Assessed if work incomplete
Single-family CO shortcut
Permit inspection record serves as CO
Appeal body
Hearing examiner, BCC 23.05.160
Penalty
Civil fine or misdemeanor

Summary

Bellevue's building official inspects all permitted construction at defined stages under BCC 23.05.130, and work must stay accessible and exposed until each inspection is approved. A certificate of occupancy under BCC 23.05.140 can only issue after the building official finds no code violations and confirms compliance with the permit.

A. General. Construction or work for which a permit is required shall be subject to inspection by the building official and such construction or work shall remain accessible and exposed for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of this chapter, the technical codes, or of other ordinances of the city. Inspections presuming to give authority to violate or cancel the provisions of this chapter, the technical codes, or of other ordinances of the city shall not be valid. It shall be the duty of the permit applicant to cause the work to remain accessible and exposed for inspection purposes. Neither the building official nor the city shall be liable for expense entailed in the removal or replacement of any material required to allow inspection. When the installation of an electrical system is complete, an additional and final inspection shall be made. Electrical systems and equipment regulated by the National Electrical Code shall not be connected to the energy source until authorized by the building official.

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 6929, passed July 14, 2026).

Full Breakdown

130(C) lists fourteen required inspection categories tied to specific construction stages: footing and foundation, electrical underground, concrete slab and under-floor, lowest floor elevation in flood hazard areas, exterior wall sheathing, roof sheathing, combined mechanical/gas/plumbing/electrical rough-in, framing, protected wood-cover connections, lath and gypsum board, fire-resistant penetrations, energy efficiency (envelope, mechanical, and lighting/motors), special electrical inspection, and a final inspection after all permitted work is complete. 130(J). A reinspection fee applies under subsection D when work is incomplete, corrections weren't made, or approved plans aren't on site. 140(A)'s exception lets the approved building permit inspection record itself serve as the certificate of occupancy, once the final inspection passes. 140(D).

Violations & Fines

Occupying a building or covering work before the required inspection is unlawful under BCC 23.05.170(A). The city can charge it as a civil violation under Chapter 1.18 BCC with a monetary penalty, or prosecute it as a misdemeanor under BCC Title 10's Criminal Code, with each day of the condition counted as a separate offense under BCC 23.05.170(D).

Frequently Asked Questions

What inspections does Bellevue require during construction?
Fourteen categories under BCC 23.05.130(C): footing and foundation, underground electrical, concrete slab, exterior wall and roof sheathing, combined rough-in for mechanical, gas, plumbing and electrical, framing, lath and gypsum board, fire-resistant penetrations, energy efficiency, special electrical inspection, and a final inspection, each tied to a specific point in construction.
Do I need a certificate of occupancy for a single-family house in Bellevue?
Not a separate document. Under the exception in BCC 23.05.140(A), for single-family dwellings and their accessory structures, the building official's approved final inspection record on the building permit itself serves as the certificate of occupancy.
What happens if I cover work before Bellevue inspects it?
The building official can require it uncovered for inspection under BCC 23.05.130(J), and BCC 23.05.170 makes the underlying violation unlawful, exposing the owner or contractor to a civil monetary penalty under Chapter 1.18 BCC or misdemeanor prosecution under BCC Title 10.

Sources & Official References

Other rules in Bellevue

All Bellevue rules

Compare Bellevue to another location·View the Washington building safety overview

Get notified when Building Inspections in Bellevue, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Inspections in Nearby Cities

How other cities in King County handle building inspections.

Renton, WA
Some Restrictions
Kirkland, WA
Some Restrictions
Auburn, WA
Some Restrictions