Key Facts

Enforcing office
Electrical Inspector, Building and Inspection Division
Notice of rejected work
2 business days after notification
Concealed work rule
Rough-in and final inspection required
Connection ban
Unlawful to connect service before approval
Penalty
$25-$250 fine or up to 90 days jail

Summary

In the City of Bowling Green, Kentucky, the Electrical Inspector must inspect and approve all electrical work before it is concealed or connected to service. Sec. 10-3.04 of the Bowling Green Code of Ordinances requires the installer to notify the Electrical Inspector once work is complete, and gives the inspector authority to reject noncompliant work within two business days.

a. All electrical work and installation of any electrical apparatus, material or device whatsoever, for use in connection with electricity for light, heat or power shall be inspected by the Electrical Inspector. b. When such installation, repair or alteration of electrical wiring or equipment has been completed, the Electrical Inspector shall be notified thereof, and such inspection as herein provided shall be made. c. Should the Electrical Inspector not approve any of the work or equipment as not being in accordance with the provisions of this Section or the National Electric Code, notice shall be given by the Electrical Inspector to the person engaged in the work within two (2) business days after notification thereof or within further reasonable time as may, upon request, be prescribed. Any unapproved work or equipment shall be altered or removed as the case may require, and the necessary changes shall be made so that all such work or equipment shall fully comply with the provisions of this Chapter and the National Electrical Code.

Full Breakdown

The Building and Inspection Division of the Department of Neighborhood and Community Services runs Bowling Green's electrical inspection program under Chapter 10 of the Code of Ordinances. Sec. 10-3.04 requires that all electrical work and installation of any apparatus, material or device used for light, heat or power be inspected by the Electrical Inspector; the person doing the work must notify the inspector when installation, repair or alteration is complete so the inspection can be made. If the Electrical Inspector does not approve the work because it fails this Chapter or the National Electrical Code, the inspector must give notice within two business days of notification (or a further reasonable time on request), and any unapproved work or equipment must be altered or removed until it fully complies.

Sec. 10-1.07.a separately requires rough-in and final inspection on any electrical work that may be concealed by concrete or other building finish, and under Sec. 10-2.03 the Electrical Inspector places a rough-in sticker in the panel once wiring methods, box fill, conduit sizing and grounding pass, then a Final Inspection Sticker once the completed work conforms to the Code; a Certificate of Compliance Form is then issued to the utility and, on request, to the Master Electrician. Sec. 10-3.03 makes it unlawful to connect any wiring to service before the Electrical Inspector gives approval, and Sec.

10-3.06 lets the inspector disconnect service and post a notice on conductors found dangerous, unsafe or installed without a permit; removing that notice or reconnecting before re-approval is also unlawful.

Violations & Fines

Under Sec. 10-5 of the Code, violating any provision of Chapter 10, including inspection and approval requirements, is a misdemeanor punishable by a fine of not less than twenty-five dollars ($25.00) nor more than two hundred fifty dollars ($250.00), imprisonment of not more than ninety (90) days, or both, with each day a violation continues a separate offense. Connecting service before inspection approval or removing a disconnection notice is independently unlawful under Secs. 10-3.03 and 10-3.06.

Frequently Asked Questions

When must Bowling Green electrical work be inspected?
Once installation, repair or alteration is complete, the installer must notify the Electrical Inspector so the required inspection under Sec. 10-3.04 can be made before the work is covered or connected to service.
What happens if the inspector rejects electrical work?
The Electrical Inspector must give notice of disapproval within two business days, and the unapproved work or equipment must be altered or removed until it fully complies with the Code and the National Electrical Code.
Can I connect power before the inspection is approved?
No. Sec. 10-3.03 makes it unlawful to make any electrical connection until the Electrical Inspector has given approval, and the inspector may disconnect service already connected without it.
What is the penalty for skipping a required inspection?
Violating Chapter 10's inspection requirements is a misdemeanor under Sec. 10-5, punishable by a fine of $25 to $250, up to 90 days imprisonment, or both, with each day counted as a separate offense.

Sources & Official References

Other rules in Bowling Green

All Bowling Green rules

Compare Bowling Green to another location·View the Kentucky building safety overview

Get notified when Building Inspections in Bowling Green, KY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.