Everett, MA Building Safety: Building Inspections (2026)
Key Facts
- Who issues the certificate
- Inspector of Buildings
- Certificate of occupancy fee
- $50.00 single-family, $75.00 two-family, $100.00 three-family
- Re-inspection fee
- $40.00 per inspection
- Three-family inspection cycle
- Every five (5) years, $75.00
- Vacant rental inspection response
- Ten (10) business days
Summary
In the City of Everett, Massachusetts, Section 10 of the Zoning Ordinance makes it unlawful to use any part of a newly erected building or structure until the Inspector of Buildings has issued a certificate of occupancy showing the use and construction follow the ordinance. Section 4-1 sets certificate fees of $50.00 single-family, $75.00 two-family and $100.00 three-family.
It shall be unlawful to use any part of any building or structure hereafter erected, until a certificate of occupancy shall have been issued therefor by the Inspector of Buildings, showing that the proposed use and construction are in accordance with this ordinance. No permit for excavation or construction shall be issued by the Inspector until he is satisfied that the plans and intended use of the building conform to the provisions of this ordinance, when required in accordance with the Massachusetts State Building Code. No application for a certificate of occupancy shall be received by the Inspector of Buildings, relating to the manufacturing or processing of anything containing animal, poultry or vegetable matter, unless such application shall contain the written approval of the Board of Health.
Full Breakdown
The final stage of a new building in Everett is the certificate of occupancy. Zoning Section 10 makes it unlawful to use any part of a building or structure hereafter erected until the Inspector of Buildings issues the certificate, showing that the proposed use and construction are in accordance with the ordinance. The same section bars the Inspector from issuing a permit for excavation or construction until he is satisfied that the plans and intended use conform to the ordinance, when required in accordance with the Massachusetts State Building Code. It also says no application for a certificate of occupancy relating to manufacturing or processing anything containing animal, poultry or vegetable matter is received unless it contains the written approval of the Board of Health.
The process starts earlier. Zoning Section 9 requires an application to be filed with the Inspector of Buildings before proceeding with any work of the kind specified in Section 3, with plans in duplicate drawn to scale in ink or blueprint, giving dimensions, radii and angles of the lot, the heights, dimensions and locations of all buildings, existing and intended uses, and the number of families to be housed. A copy of the approved plans is returned to the applicant with the permit.
Section 4-1 of the Revised Ordinances prices the inspection steps. A certificate of occupancy costs $50.00 for a single-family, $75.00 for a two-family, $100.00 for a three-family, and $40.00 per 1,000 square feet for all others. A re-inspection costs $40.00 per inspection, and a plumbing re-inspection permit is $40.00 per fixture, per visit. Three-family homes are to be inspected every five (5) years at $75.00, as modified and amended by Section 106.5 of the Massachusetts State Building Code.
Rental turnover has its own inspection. Under Section 10-27 an owner must request a legal use of status from the Building Department before renting a vacant dwelling unit, with a $25.00 application fee. Section 10-28 gives the Everett Health Department ten (10) business days to respond; if no inspection is made in that time, the owner can rent the apartment.
Violations & Fines
Occupying a newly erected building without a certificate of occupancy violates Zoning Section 10, and Zoning Section 13 sets a fine of not more than $20.00 for each offense and each day it continues. Under Section 10-33, an owner who lets people live in a dwelling unit without a certificate of fitness faces a fine not to exceed $25.00 for each violation, and each day is a separate offense. Work started without a permit is charged double the permit fee plus the permit fee under Section 4-1.
Frequently Asked Questions
Who issues a certificate of occupancy in Everett, Massachusetts?
How often are three-family homes inspected in Everett?
How long does Everett have to inspect a vacant unit before I rent it?
What does a re-inspection cost in Everett?
Sources & Official References
Other rules in Everett
Compare Everett to another location·View the Massachusetts building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Building Inspections in Nearby Cities
How other cities in this county handle building inspections.