Jessamine County, KY Building Safety: Building Inspections (2026)
Key Facts
- Sections
- Jessamine County Code §§ 150.01 and 150.02
- Building code
- Kentucky Building Code, 815 KAR 7:070 through 7:125
- Enforcement agency
- Jessamine County-City of Wilmore Planning and Zoning Office
- Dwelling inspection fee
- $70 for rough in, TOP and final, per trip
- Contract-based fees
- $400 flat to $30,000; 1.25% then 1% above
- Fee schedule adopted
- Ordinance passed 4-2-2019
Summary
In unincorporated Jessamine County, Kentucky, Chapter 150 adopts the Kentucky Building Code in full, names the Jessamine County-City of Wilmore Planning and Zoning Office as the local enforcement agency, and charges electrical inspection fees: $70 per rough in, TOP and final trip for dwellings, with percentage fees on larger contracts.
§ 150.01 KENTUCKY BUILDING CODE; ADOPTED. ... (A) (1) The Kentucky Building Code, as promulgated in 815 KAR 7:070 through 7:125 by the Board of Housing, Buildings and Construction, Commonwealth of Kentucky, is hereby adopted in full as an ordinance of Jessamine County of the Commonwealth of Kentucky, as if set out at length herein. ... (B) The Jessamine County-City of Wilmore Planning and Zoning Office shall be designated as the local enforcement agency for the Kentucky Building Code. (C) The application of the Kentucky Building Code is hereby extended to all single-family dwellings to be constructed in the county. ... § 150.02 ELECTRICAL INSPECTION FEES. Electrical inspection fees in the unincorporated areas of county shall be as follows. (A) Rough in, TOP and final: $70. (1) Fees shall apply to single-family dwellings, mobile homes, renovations, service change outs, barns, out buildings, garages, room additions, swimming pools, and temporary construction service. (2) Per requested trip, including turn downs, inspection fees are due when the inspection is made (each trip).
Full Breakdown
Section 150.01 adopts the Kentucky Building Code, as promulgated in 815 KAR 7:070 through 7:125 by the Board of Housing, Buildings and Construction, as an ordinance of Jessamine County as if set out at length. A copy, with the regulations and NFPA pamphlets it refers to, sits in the office of the Jessamine County Clerk, and the Clerk must keep a copy at all times. The Jessamine County-City of Wilmore Planning and Zoning Office is designated the local enforcement agency. The Fiscal Court extended the code to all single-family dwellings to be constructed in the county, and the section took effect on February 7, 2012.
Section 150.02 sets the electrical inspection fees in the unincorporated areas of the county, and its wording shows the inspection stages. Rough in, TOP and final inspections cost $70. That fee applies to single-family dwellings, mobile homes, renovations, service change outs, barns, out buildings, garages, room additions, swimming pools and temporary construction service. It is charged per requested trip, including turn downs, and is due when the inspection is made. For a duplex or multi-family dwelling the first unit rough-in is $70 per trip and the second unit and each after is $50 per unit, per trip.
Larger jobs are priced by contract value. Electrical work not exceeding $30,000 carries a $400 flat rate. Work from $30,001 to $250,000 is charged 1.25% of the total contract, and $250,001 and higher is charged 1%. The electrical contractor must provide copies of all contracts, plus the total cost of electrical materials and labor supplied by others, and the fee is calculated on the total cost of the electrical system, including emergency power equipment, fire alarm systems and all data, communication and alarm systems. Electrical permits are not issued until the contractor complies. A separate fee is calculated for each contract, and dwelling fees are per 200 amps of service. On commercial and industrial inspections, one third of the fee is due when the permit is issued, one third before the power is turned on, and the balance 30 days prior to final inspection. Certificates of compliance are not issued until fees are paid in full.
Violations & Fines
Chapter 150 prints its consequences as administrative holds: electrical permits are not issued until the electrical contractor provides the contract and cost documents, and certificates of compliance are not issued until fees are paid in full. Inspection fees fall due at each requested trip, including turn downs, when the inspection is made.
Frequently Asked Questions
Who enforces the building code in unincorporated Jessamine County?
Does the building code apply to single-family homes?
How much is an electrical inspection?
When are fees due on commercial electrical work?
Sources & Official References
Other rules in Jessamine County
Compare Jessamine County to another location·View the Kentucky building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.