New Orleans, LA Building Safety: Building Inspections (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
Building Code § 110 (City Code § 26-15)
Required stages
Footing, slab, frame, lath, final
Notice duty
Permit holder must request each inspection
Roofing option
Geotagged photo/video may replace in-person visit
Occupancy link
Final inspection required before certificate of occupancy

Summary

New Orleans requires a sequence of Director-conducted inspections during construction -- footing, slab, framing, lath and final -- under Building Code § 110. Work must stay accessible until each stage passes, and a final inspection is required before the city issues a certificate of occupancy.

110.1 General. Construction or work for which a permit is required is subject to inspection by the Director and the construction or work shall remain accessible and exposed for inspection purposes until approved... 110.3 Required inspections. The Director, upon notification, shall make the inspections set forth in Sections 110.3.1 through 110.3.9. 110.3.1 Footing or foundation inspection. Footing and foundation inspections shall be made after excavations for footings are complete and any required reinforcing steel is in place... 110.3.4 Frame inspection. Framing inspections shall be made after the roof deck or sheathing, all framing, fire blocking and bracing are in place and pipes, chimneys and vents to be concealed are complete and the rough electrical, plumbing, heating wires, pipes and ducts are approved... 110.3.9. Final inspection. The final inspection shall be made after all work required by the building permit is completed.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 116 Update 1).

Full Breakdown

1. 2 lets the Director conduct a preliminary inspection of the building, structure or site. 9). 13 bars moving past any stage without the Director's written approval -- noncompliant work must be corrected and stays uncovered until authorized. 11 lets applicants substitute geotagged photo or video documentation for an in-person roofing inspection.

Violations & Fines

Covering or concealing work before the required stage inspection is approved violates § 110.13, and the Director can require the covering material removed to expose the work, at the permit holder's expense under § 110.1. No certificate of occupancy issues under § 111.1 until the final inspection under § 110.3.9 passes, so an unapproved stage effectively blocks occupancy and use of the structure.

Frequently Asked Questions

What inspection stages does New Orleans require during construction?
Building Code § 110.3 requires footing or foundation, concrete slab or under-floor, lowest-floor elevation, framing, lath or gypsum board, and final inspections, each tied to a specific point in construction before work can be covered.
Who has to schedule building inspections in New Orleans?
Section 110.12 puts that duty on the building permit holder or their agent, who must notify the Director of Safety and Permits when work is ready and provide access for the inspection.
Can I cover framing before the frame inspection in New Orleans?
No. Section 110.13 bars work from proceeding beyond the point checked in each inspection without the Director's approval, and any portion that doesn't comply must be corrected and stay uncovered until authorized.
Can New Orleans accept photos instead of an in-person roofing inspection?
Yes, for roofing and re-roofing. Section 110.11 allows verified geotagged photographic or video documentation of all phases of the roofing process in lieu of an in-person inspection.

Sources & Official References

Other rules in New Orleans

All New Orleans rules

Compare New Orleans to another location·View the Louisiana building safety overview

Get notified when Building Inspections in New Orleans, LA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.