Key Facts

Enforcing official
Director, Dept. of Inspections, Licenses and Permits
Master permit
Lets one holder skip per-job inspections
Reinspection fee
Charged for missed or repeat inspections
Occupancy check
Grading certification required if site graded
Appeals
Go to Howard County Board of Appeals
Records
Inspections/violations logged by Building Official

Summary

After issuing a building permit, Howard County's Building Official inspects work under Code Section 3.101(b)(35), which locally amends IBC Section 110.3. Businesses doing repeat work can seek a master permit under Section 105.1.1, and Section 109.5.1 charges a reinspection fee whenever a site is not ready or a violation recurs.

These county ordinances apply to unincorporated areas of Howard County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(35)Subsection 110.3 Required inspections. Delete the sentence that begins "The building official" and substitute: "After issuing a building permit, the Building Official shall conduct inspections from time to time during and upon completion of the work for which the permit has been issued. Records of inspections and violations shall be maintained by the Building Official. An inspection may include any of the inspections as set forth in subsections 110.3.1 through 110.3.12 of this section."

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 91 | Zoning: Supplement 25).

Full Breakdown

12. 1 requires a Building Code Compliance Assurance Manual describing the applicant's inspection and Code-compliance procedures. 1 whenever work was not ready at the scheduled time, the inspector could not access the site, a violation had to be re-checked more than once, or the inspector finds flagrant non-compliance such as cut trusses, missing load-bearing studs or omitted fire stopping. 1 requires a registered land surveyor's certification that site grading and drainage match the approved site development or erosion and sediment control plan; fine grading may be deferred to the next growing season if the owner posts adequate surety. 1, which reviews claims that the Code was misapplied, does not apply, or that an equally good form of construction is proposed.

Violations & Fines

Reinspection triggers a fee any time the Building Official's inspector cannot complete the check as scheduled or must return for the same violation, and flagrant non-compliance found during an inspection, such as cut or broken trusses, missing load-bearing studs or omitted fire stopping, is separately called out under Section 109.5.1. Failing to correct violations found at inspection can trigger withholding of further permits and inspections under Section 114.5, plus civil or criminal penalties under Title 24, with each day of a continuing violation a separate offense.

Frequently Asked Questions

What triggers a reinspection fee in Howard County?
A fee applies if the work was not ready at the pre-arranged time, the inspector could not access the site, the same violation had to be checked more than once, or the inspector discovers flagrant non-compliance like cut trusses, missing load-bearing studs or missing fire stopping, under County Code Section 109.5.1.
What is a master permit and how does it change inspections?
A master permit, issued under Section 105.1.1, lets a business that regularly employs qualified tradespeople make ongoing alterations without applying for a new permit each time. The holder must keep detailed records the Building Official can inspect at any time, and submit a Building Code Compliance Assurance Manual describing its inspection procedures.
Can I appeal a failed inspection or permit decision?
Yes, except for a notice of violation, which cannot be appealed. Other permit decisions go to a hearing examiner of the Howard County Board of Appeals under Section 113.1, and the appeal must argue the Code was misapplied, does not apply, or that an equally good form of construction was proposed.

Sources & Official References

Other rules in Howard County

All Howard County rules

Compare Howard County to another location·View the Maryland building safety overview

Get notified when Building Inspections in Howard County, MD changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.