Travis County, TX Building Safety: Building Inspections (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Minimum inspections
3 for new residential construction
Stages
foundation, framing/mechanical, completion
Applies to
single-family/duplex begun after 9/1/2009
Reports due
10 days after final inspection
Recipient
Travis Co. Transportation & Natural Resources Dept.
Penalty
Class C misdemeanor (Sec. 480.009)

Summary

New residential construction in unincorporated Travis County needs a minimum of three inspections: foundation before concrete, framing and mechanical before drywall, and a final inspection on completion. Sec. 480.005 sets the stages, and Sec. 480.006 requires the builder to hire a licensed inspector for each one.

City-specific rules exist: Austin has its own building inspections rules that differ from Travis County's county-level regulations. If you live in Austin, check the city-specific page instead.

A person who builds new residential construction shall have the construction inspected to ensure building code compliance in accordance with this section as follows: For new residential construction on a vacant lot, a minimum of three inspections must be performed during the construction project to ensure code compliance, as applicable, at the following stages of construction: the foundation stage, before the placement of concrete; the framing and mechanical systems stage, before covering with drywall or other interior wall covering; and on completion of construction of the residence.

Full Breakdown

Chapter 480 applies to new single-family and duplex construction that began after September 1, 2009 in the unincorporated county, and requires it to meet the International Residential Code as published May 1, 2008, or the version Austin enforces inside its own limits, whichever the builder chooses, per Sec. 004. Sec. 005 sets the inspection stages for construction on a vacant lot: a minimum of three inspections, at the foundation stage before concrete is placed, at the framing and mechanical systems stage before drywall or other interior wall covering goes up, and on completion of construction of the residence.

An addition to an existing home is inspected as necessary based on the scope of the work rather than at fixed stages. Sec. 006 puts the burden on the builder in charge of the project to contract for these inspections with a licensed engineer, a registered architect, a Texas Real Estate Commission-licensed professional inspector, a municipally employed plumbing inspector licensed by the Texas State Board of Plumbing Examiners, a building inspector employed by a political subdivision, or an individual certified as a residential combination inspector by the International Code Council; the same inspector can cover every stage or a different one can be used for each.

Sec. 007 requires the builder to notify the county before construction begins, listing the site, the expected start date and the code edition used, then to submit electronic inspection reports to the Travis County Transportation and Natural Resources Department within 10 days after the final inspection, copying the property owner if different from the builder. Where a city's extraterritorial jurisdiction building code applies, that city's code controls instead of Chapter 480, per Sec. 004(b).

Violations & Fines

Failing to submit the required notice or inspection reports is a Class C misdemeanor under Sec. 480.009. The County can also refer a noncompliant inspector to the appropriate licensing board for discipline or have the County Attorney sue for injunctive relief under Sec. 480.008. An owner-builder who acts as their own contractor and intends to use the home as a primary residence is exempt from the criminal penalty, though the inspection requirements themselves still apply.

Frequently Asked Questions

How many inspections does new home construction need in unincorporated Travis County?
At least three: one at the foundation stage before concrete is poured, one at the framing and mechanical systems stage before drywall goes up, and a final inspection on completion of the residence, per Sec. 480.005. Additions to existing homes are inspected as needed based on the scope of the work instead.
Who is allowed to perform the inspections?
Sec. 480.006 lets the builder hire a licensed engineer, a registered architect, a Texas Real Estate Commission-licensed inspector, a municipally licensed plumbing inspector, a political subdivision's building inspector, or an ICC-certified residential combination inspector. The builder may use one inspector for every stage or a different one for each.
What happens if a builder skips the required notice or reports?
It is a Class C misdemeanor under Sec. 480.009. The County can also refer the inspector for licensing discipline or have the County Attorney seek an injunction under Sec. 480.008. An owner who builds their own primary residence and self-contracts is exempt from the criminal penalty, per Sec. 480.009.
Does this chapter apply everywhere in Travis County?
No. Sec. 480.004 applies it only to the unincorporated county, built under the 2008 International Residential Code or Austin's version. Where a city has adopted its own building code for its extraterritorial jurisdiction, that municipal code controls instead and Chapter 480 has no effect there.

Sources & Official References

Other rules in Travis County

All Travis County rules

Texas rules heatmap·Compare Travis County to another location·View the Texas building safety overview

Get notified when Building Inspections in Travis County, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Inspections in Cities Across Travis County